Work Cells (tirpt0140m000)
Use this session to view and manage work centers of the type work cell.
Field Information
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Work Cell
-
The work cell ID.
- Address
- Available Labor Resources (FTE)
-
The number of operators required for the work cell.
- Operation Rate Code
- Production Department
- Repair Cell
-
The ID of the repair cell linked to the work cell.
- Actual Calendar
-
The calendar code and availability type combination that is used by the work center manufacturing a production order during a specific period.
- Work Cell Calendar
-
The calendar linked to the specified work cell.
If no calendar is specified, the production department calendar is used.
- Enterprise Unit
- Work Cell Plan Group
-
The ID of the plan group to which the work cell is assigned.
- Report on Work Stations
-
schedule lines are reported completed at work station and work cell levels.
schedule lines are only reported completed on work cell level.
Note: Reporting completed is mandatory at work stations marked as count points. - Work Cell Type
-
Specify the type of work center:
- Work Cell
- Repair Cell