Job Shop Routing (tirou4600m000)

Use this session to manage routings by revision and site.

This session displays data from the following session:

Note: To use this session the Job Shop by Site parameter in the Concept Activation (tcemm4600m000) session must be set to Active or In Preparation.

Field Information

.
Site

The site ID.

Note: 
  • You can only select sites for which you are authorized.

  • For site-specific operation rates, this field must be filled.
  • For non-site-specific operation rates, leave this field blank.
Product

The item being produced.

Routing

The routing ID.

Revision

The revision for which the routing is used.

Status

The status of the routing.

New
Approved
Expired
Effective Date

The date the routing becomes effective.

Expiry Date

The date on which the operation line is no longer valid.

If you do not specify an expiry date, LN automatically sets the date to its maximum value.

Effective date of materials and operations

Plan Group

The scheduler plan group the routing is linked to.

Standard Routing

the operation sequence is linked to a standard routing for the selected item and site combination. and may apply to several items. The Standard Routing Code field contains the standard routing code.

Standard Routing

Standard Routing Code

If the Standard check box is selected, this field must contain a standard routing code.

Standard Routing

Standard Routing Revision

If the Standard check box is selected, this field must contain a standard routing code.

Standard Routing

If the Standard check box is selected, this field must contain a standard routing code.

Standard Routing

Quantity
Routing Quantity

The quantity of product on which the cycle time is based.

Minimum Quantity

The minimal quantity of product for which the routing is used.

Maximum Quantity

The maximal quantity of product for which this routing is used.

Lead Time
Calculate

Select the lead time calculation method.

  • Automatic

    If this option is selected, the Lead Time field in the Job Shop Routing (tirou4600m000) session is disabled. If you edit the Time Unit field in the Job Shop Routing (tirou4600m000), the lead time for the routing is recalculated.

  • Manual

    If this option is selected, you can set the lead time using the Lead Time field in the Job Shop Routing (tirou4600m000) session.

Lead Time

order lead time

You can determine the order lead time by using the Calculate Lead Time command.

  • The value of this field is calculated based on the routing operations and the data specified in the Items - Ordering by Site (tcibd2150m000) session.
  • The lead time, as based on the cycle time and other values, is multiplied with the economic order quantity specified in item ordering by site.
Based on

When the lead time is calculated, the quantity the calculation is based on is displayed in this field. The quantity is taken from the Items - Ordering by Site (tcibd2150m000) session, depending on the order method from either the Fixed Order Quantity or Economic Order Quantity fields.

Revision
Created On

The date the routing was created.

Subcontracting with Material Flow

only subcontracting with material flow is used to produce the item.

Available for Planning

the job shop routing is available for use in planning.

Created By

The employee who created the routing.

Use for Planning

the selected JSBOM is used for planning.

Note: Per item and site, only one Job Shop bill of material can be used for planning.
Approved On

The date the routing was approved.

Use for Costing

the selected JSBOM is used for costing.

Note: Only one JSBOM per product can be used for costing purposes.
Approved By

The employee who approved the routing.

Exceptions Present

exceptions are linked to this routing. In other words, the routing is unit effective controlled. If you delete the routing's exceptions in the Unit Effectivity module, the check box is cleared.

Note: You cannot define exceptions for a standard routing.

Expired On

The date the routing was expired.

Standard Configuration

the routing is part of an item’s standard configuration. The costs related to the routing are included in the standard cost price. If the Standard Configuration check box is cleared, the routing is not part of an item’s standard configuration. The costs related to the routing are not included in the standard cost price.

The Standard Configuration check box in combination with the setting of the Valid check box in the Exceptions (tcuef0105m000) session indicates whether the routing is used for a specific effectivity unit.

  • If the Standard Configuration check box is selected, and the Valid check box is cleared for an exception linked to the routing, the routing will be omitted for a specific effectivity unit or requirement.
  • If the Standard Configuration check box is cleared, and the Valid check box is selected for an exception linked to the routing, the routing will be added for a specific effectivity unit or requirement.
Note: If the routing has exceptions attached, but you do not want to use the exceptions, for example, for selling spare parts, or for an end item which is not unit-effective, then you can clear this check box.

Expired By

The employee who expired the routing.

Text

additional text is present.

Labels
Print Labels

labels must be printed for this production process.

Note: This check box must be selected to edit the Label Type, Procedure and Label Printed By fields.
Label Type

Specify the type of label.

  • Internal

    The standard labels are used, independent of the customer.

  • Customer

    The label is printed containing customer information retrieved from the demand orders along with the standard information.

Procedure

Specify the procedure used for label handing.

Scan to Book
If this option is selected, labels are printed before production starts. Handling units are generated with the labels. The produced quantities completed must be reported through handing units. This can be done with a scanner or manually.
During Warehouse Receipt
If this option is selected, handling units and labels are generated sequentially upon receipt confirmation of goods in the warehouse.
Report Order
If this option is selected, labels are printed at the Report Orders Completed process. The reporting is done on quantities.
Not Applicable
Note: The procedure Scan to Book is applicable only if the Allow Alternative Package Definition check box is cleared.
Label Printed By

Specify the application responsible for printing the label.

Infor LN

  • If this option is selected, LN is responsible for printing the labels.
  • External Application

    If this option is selected, the publication of the PackageLabelBOD is triggered so that an external application can print labels.
Note: 

If the Procedure field is set to During Warehouse Receipt, this field is disabled.

Printing options are defined in the Warehousing Procedures, Receipt Activities by Procedure (whinh0106m100) session.

Warehousing procedures

Label Layout

The layout used by LN to print the labels.

You can zoom to the Label Layouts (whwmd5520m000) session from this field.

Label Device

This field specifies the device LN uses to print the labels.

You can zoom to the Device Data (ttaad3500m000) session.

Note: If the Procedure field is set to During Warehouse Receipt, this field remains empty.
Number of Copies

The number of copies of labels that must be printed.

Note: If the Procedure field is set to During Warehouse Receipt, this field remains empty.
Allow Alternative Package Definition

the application allows you to use an alternative package in the Report Orders Completed (tisfc0520m000) session.

Note: This check box is displayed only if:
  • The Handling Units in Use check box is selected in the Warehouse Master Data Parameters (whwmd0100s000) session.
  • The Allow Alternative Package Definition check box is selected in the Production Order Parameters (tisfc0100s000) or the Production Settings by Site (timfc0180m000) sessions.
Related topics
Job Shop Routing