Correct Calculated Lead Time for Job Shop Routings (tirou4200m300)
Use this session to calculate routings, based on operation lead times, for job shop routings for which the routing lead time is neither calculated or set.
Field Information
- Site
-
The site for which the routing lead time is calculated.
- From
-
The range of products for which the routing lead time is calculated.
- Routing
-
The range of routings for which the lead time is calculated.
- Revision
-
The product revision for which the routing lead time is calculated.
- Status
-
The status of the routing for which the lead time is calculated.
-
New
The routing was generated but has not yet been approved. -
Approved
The routing is approved and is in use. -
Expired
The routing has expired and can no longer be used.
-
-
- Automatic
-
lead times are only calculated with routings with the lead time calculation method Automatic.
- Manual with zero Lead Time
-
lead times are only calculated for routings with the lead time calculation method set to Manual or zero lead time.
-
- Simulation
-
the routing lead times calculation is simulated and no changes are made.
- Print Report
-
a report is printed once the lead time calculation is completed.