Use this session to manage individual machines of a machine capacity group.

Field Information

Site

The site to which the machines are linked.

Machine Number

The designation of the machine.

Work Center

The work center to which the machine is linked.

Machine Type

machine type

Production Department

production department

Priority

The priority for selecting a machine. The highest priority is indicated by 1, the lowest by 999. If an order needs two machines out of a group of four, the two with the highest priority are chosen.

Report Product

The production reporting method for the machine numbers:

Report Machine Hours

The reporting method for the spent machine hours: