Project Parts (tipcs2111m000)
Use this session to create and/or display project parts.
You can maintain project parts in the details session.
You can make a product structure for an item in the:
- Project Parts (tipcs2111m000) session
- Item - Production (tiipd0101m000) session
- Generate (Project) Structure for Product Variant (tipcs2220m000) session
A project part is added in the Project Parts (tipcs2111m000) session. The Quantity field for this project is 0. This means that a product variant structure is available, but is not taken into account when calculating the project costs.
Field Information
- Project
-
Enter the code of the project for which you want to enter project part data.
- Project Status
-
Indicates the current progress of the project.
- Item
-
The customized or standard item that is entered as a project part.
- Description
-
The description of the project.
- Effectivity Unit
-
Enables you to generate a requirements planning based on the combination of item and effectivity unit. The unit that is connected to the item is always the unit of the top item.
- Freeze Standard Cost on Date
-
the estimate is based on the fixed standard cost. LN retrieves the standard cost which was valid on the date entered.
the latest standard cost is retrieved.
- Freeze Standard Cost Date
-
The standard cost that is valid on the date specified in this field is taken for the standard cost calculations.
- Quantity
-
The quantity of the customized or standard item.
- Project Type
-
Is used to characterize projects. A project can have one of the following types:
- Project Part
- Inventory Unit