Item - Production by Site (tiipd0151m000)
Use this session to specify item production data by site.
Field Information
- Item
-
The main item.
- Site
-
The site where the item is produced or used as a material.
Note:- Multisite functionality must be active, for this field to be visible.
- Country
-
The country where production takes place.
- City
-
The city where production takes place.
- Use Global Item Production
-
the global item production data is used for the site. Consequently, changes to the item data at company level are synchronized automatically to the site level.
- Inventory Unit
-
The unit in which the quantity is expressed.
- Initial Hidden
-
- Default Supply Source
-
The default supply source determines the default supply method for the item when the inventory on hand is not sufficient.
Note: You can temporarily change the supply source of Purchased, Manufactured or Product items in the Date-Effective Supply Source (tcibd0510m000) session. - Backflush Materials
-
the components are issued through backflushing.
Serialized items
Serialized items can only be backflushed if in the Item - Warehousing (whwmd4500m000) details session the Serials in Inventory check box is cleared, and the Register Serial Issue During As Built field is Yes. In all other cases, serialized items cannot be backflushed.
If the serialized item is lot-controlled, the lot from which the items are backflushed is based on the outbound method ( Last In First Out (LIFO), First In First Out (FIFO)) as is defined in the Item - Warehousing (whwmd4500m000) details session.
- Backflush Hours
-
you can backflush the hours spent to manufacture the item to a backflush employee.
- Backflush if Material
-
the item is backflushed when it is used as a component in the product structure of another item.
Serialized items can only be backflushed if in the Item - Warehousing (whwmd4500m000) details session the Serials in Inventory check box is cleared, and the Register Serial Issue During As Built field is Yes. In all other cases, serialized items cannot be backflushed.
If the serialized item is lot-controlled, the lot from which the items are backflushed is based on the outbound method ( Last In First Out (LIFO), First In First Out (FIFO)) as is defined in the Item - Warehousing (whwmd4500m000) details session.
- Direct Initiate Inventory Issue
-
the warehouse outbound procedure is automatically initiated, after material is unblocked in the warehouse.
and you unblock warehouse order lines using the Initiate Inventory Issue (tisfc0207m000) session, the quantity to issue is added to the value specified in the To Issue by Warehousing field in the Material to Issue for Production Orders (ticst0101m100) details session. You must manually carry out the remainder of the warehousing procedure.
If you use the Initiate Inventory Issue (tisfc0207m000) session, warehouse order lines for the materials to issue are unblocked. You can also select the Direct Initiate Inventory Issue check box for the materials. Consequently, warehouse order lines are automatically unblocked when the production order is released.
- Direct Proc Wh Order Line
-
the warehouse outbound procedure is automatically initiated, after material is unblocked in the warehouse.
and you unblock warehouse order lines using the Initiate Inventory Issue (tisfc0207m000) session, the quantity to issue is added to the value specified in the To Issue by Warehousing field in the Material to Issue for Production Orders (ticst0101m100) details session. You must manually carry out the remainder of the warehousing procedure.
If you use the Initiate Inventory Issue (tisfc0207m000) session, warehouse order lines for the materials to issue are unblocked. You can also select the Direct Initiate Inventory Issue check box for the materials. Consequently, warehouse order lines are automatically unblocked when the production order is released.
Note: If the current item is to be a low volume serialized item, this check box must be cleared. - Conformance Reporting
-
The conformance reporting code.
- General
-
- Actual Supply Source
-
The actual supply method used to replenish the inventory on hand for the current date.
- Job Shop
-
A bill of material (BOM) and routing are available for the item. The demand is filled by a production order.
- Repetitive
-
A list of materials and a work cell are available for the item. The demand is filled by a production schedule.
- Assembly
-
An assembly bill of material (BOM) and assembly lines are available for the item. The demand is filled by an assembly order.
- Purchase
-
No production data is available for item. The demand is filled by a purchase order.
- Subcontract
-
The item is supplied by subcontracting the production process. A bill of material (BOM) is specified for this item.
Note: The Subcontracting with Material Flow check box must be selected to select this supply source. - Distribution
-
The item is supplied by a planned distribution order.
- Item Production Text
-
item production text is present.
- Outbound Inspection
-
material is inspected when issued from a warehouse.
- Critical for Inventory
-
you can check the availability of the item if used as material for the production order.
These checks are performed:
- The Check Inventory (tiasc2240m000) session in the Assembly Control module.
- The Print Material Shortages by Production Order (tisfc0419m000) session.
- Receipt Inspection
-
and the item produced is the end item, an inspection must be performed when the item is received in the warehouse.
When the warehouse order is created, LN recognizes inspection is required and adds the warehouse inspection step to the activities of that order.
An inspection can also be part of the warehouse order type procedure.
In both cases, this check box being selected for the item or the inspection being part of the procedure, an inspection will be required.
- Item Image
-
The image of the item.
- Job Shop BOM
-
- Product BOM
-
- Customized
-
he item is customized.
- Standard To Order
-
the item is created based on the Standard-to-Order generation method, as specified in the Generation Method field of the Generate (Project PCS) Structure for Sales Orders (tdsls4244m000) session. The bill of material and the routing are defaulted from the original item.
- BOM Quantity
-
The number of items on which the item's bill of material is based. The BOM quantity enables you to specify very small item quantities as bill of material components.
Note: This field is applicable only if the Configurations by Site field is other than Active in the Implemented Software Components (tccom0100s000) session. - Derived from Item
-
The item from which the item, in the Item field, is derived.
Note: If a standard item is copied to a customized item using the Copy Standard Product Structure to Customized Structure (tipcs2230m000) session, LN displays the standard item code in the customized item's Derived from Item field. - Scrap Percentage
-
The percentage used to anticipate the loss of quantity in the manufacturing process of a product.
- Scrap Quantity
-
The quantity used to anticipate the loss of quantity in the manufacturing process of a product.
- Phantom
-
the item is a phantom.
You can overrule the Phantom check box in the Bill of Material (tibom1110m000) session.
- Use Phantom Inventory
-
LN checks if any phantom inventory is available.
If the phantom item is available in inventory, and the quantity is sufficient, this inventory is used as component in the production order.
If no phantom inventory is available, or if the quantity is insufficient, the inventory is not used. LN treats the component as a normal phantom item, so the phantom is exploded for the total quantity.
Note: The phantom stock is always ignored during planning. - Turn Operation 0 into First of
-
If material of a phantom item is not linked to a specific operation, this field is used to determine the time when the material must be issued.
- Operated Item
- Order
Note:This field is only relevant if the operations of the production order originate partly from the routing of the phantom items.
For a material's operated item, see the Operated Item field in the Estimated Materials (ticst0101m000) session.
For performance reasons, it is recommended to set this field to Order. Material for multiple operations.
- Warehouse is Mandatory on BOM Line
-
for the item used as a component in the bill of material, you must specify the warehouse for this component item on the BOM line in the Bill of Material (tibom1110m000) details session.
Note: If you do not specify a warehouse on the BOM line, the warehouse specified in the Items - Ordering (tcibd2100m000) session is used for the production order material line. - Quantity-dependent Routing
-
a specific routing is used, dependant on the order quantity.
The quantity dependant routing may affect:
- Operation times
- Work center used
- Machines used
- Other routing dependant data
- Routing Unit
-
The quantity of the item based on which the routing is planned. You can use this unit to include short operation times in the routing of an item.
- Order Lead Time
-
The order lead time is determined when you click in this session.
Select Hours or Days as the time unit in which you want to express the order lead time.
Note: This field is applicable only if the Configurations by Site field is other than Active in the Implemented Software Components (tccom0100s000) session. - Subcontracting with Material Flow
-
only subcontracting with material flow is used to produce the item.
Note:- This check box is displayed only if the Subcontracting with Material Flow check box is selected in the Implemented Software Components (tccom0100s000) session.
- If the default supply source of the item is Assembly, this check box is unavailable.
- This field is applicable only if the Configurations by Site field is other than Active in the Implemented Software Components (tccom0100s000) session.
- Routing Group
-
If you enter a routing group in this field, you can use the routing group as a criterion to select or group production orders in Warehousing and Manufacturing .
- Job Shop Process
-
- Shop Floor Planner
-
If you enter a shop floor planner in this field, you can use the shop floor planner as a criterion to select or group production orders in Warehousing and Manufacturing .
- Net Change JSC
-
a partial explosion and netting is defined during the regenerative replanning process. LN only replans the parts of scheduled JSC orders affected by the change in the bill of material and routing.