Subcontracting WIP (ticst0607m000)
Use this session to view the subcontracting WIP costs.
The tabs refer to the following sessions:
-
Estimated Subcontracting
Subcontracting WIP Amounts (ticst0580m000) -
Actuals by Cost Component
Subcontracting WIP Actual Amounts (ticst0509m000) -
WIPActuals by Project Peg
Subcontracting WIP Actual Amounts by Project Peg (ticst0509m100)
Field Information
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Production Order
-
The production order the subcontracting WIP belongs to.
- Position
-
The position number that identifies the estimated material in the Estimated Materials (ticst0101m000) session.
- Sending WIP
-
the displayed amounts are related to the subassembly that is sent to the subcontractor.
the displayed amounts are related to the subassembly that is received from the subcontractor.
- Total Amount
-
The total cost of subcontracted WIP for the production order.
- Total Quantity
-
The total quantity of subcontracted WIP materials for the production order.
- Subassembly
-
The description of the subassembly that is subcontracted.
- Quantity Balanced
-
the quantity of outgoing subassembly is equal on the quantity of incoming subassemblies.