Cost Component Scheme (ticpr0109m000)

Use this session to maintain standard cost component schemes.

Field Information

Cost Component Scheme

The code under which cost components are collected.

You must link cost components to a scheme in the Standard Cost Scheme Details (ticpr0110m000) session.

Validated

the selected scheme is validated.

Note: A cost component scheme must be valid before it can be linked to an item.
Last Validation Date

The date validation was performed.

Modified

the cost components scheme is modified.

Last Modification Date

The date the cost component scheme was modified.

Related topics
Cost Component Scheme in Manufacturing