Check Order System for Planning (tibom1220m000)
Use this session to check and optionally correct the order system of a range of items. This check prevents particular types of error in which Enterprise Planning plans only a part of the items in an item structure or fails to transfer planned production orders to the execution level because of missing operations.
Field Information
- Check Effectivity against Date
-
the session uses the bill of material (BOM) that is valid on the date that you specify.
the session uses the current date.
- Check Effectivity against Date
-
LN checks the item structure and the order system based on the bill of material (BOM) that is valid on this date.
- Simulate Only
-
LN does not change the order systems of any item, but only generates a report.