Items - Planning (cprpd1100m000)

Use this session to view and maintain planning data by item.

Click the Item Planning Defaults option on the appropriate menu to zoom to the Item Planning Defaults (cprpd1110m000) session.

Note: 
  • You can only maintain and display planning data for items already defined in the Items (tcibd0501m000) session.
  • If you have started this session by zooming, you can only find and select a record.

The settings in this session could affect system performance and database growth. For more information, refer to Number of plan items.

Field Information

Plan Item

The ID of the plan item.

Ordering Site

The ID of the item supplying site. Supply orders are created for this site and the linked ordering warehouse.

Note: The site must belong to the same planning cluster as the selected item.

Multisite overview

Planning clusters in Enterprise Planning

Planning Cluster

The planning cluster to which the item is linked.

Multisite planning clusters

Planning clusters in Enterprise Planning

General
Plan Item Type

The type of plan item.

Family

The plan item is a product family. Goods-flow data for families is aggregated through the aggregation relationships.

Item

Goods flow data of a plan item of plan item type Item is retrieved from the execution level.

Plan Level

plan level

Plan levels and product families

Supply Source

The supply source of a plan item, which can be Item Source or Distribution.

Note: If the multisite concepts are activated, the supply source is defined in the Items by Site (tcibd1550m000) session.

Item Source

The plan item is supplied by means of production or purchase orders, unless a specific sourcing strategy is defined.

Distribution

The plan item is supplied by means of distribution orders, unless a specific sourcing strategy is defined.

Sources of supply

Overview of the multisite concepts

Actual Supply Source

The currently defined supply source.

If the multisite concepts are activated, the source of the supplying site is defined in the Items by Site (tcibd1550m000) session. The source of the supplying can be overruled in the Sourcing Strategy (cprpd7110m000) and Date-Effective Supply Source by Site (tcibd1155m000) sessions.

If the multisite concepts are inactive, the source of supply is defined in the Items (tcibd0501m000), Date-Effective Supply Source (tcibd0510m000) or Sourcing Strategy (cprpd7110m000) sessions.

Overview of the multisite concepts

Ordering Warehouse

The warehouse from and to which the item is normally delivered.

Note: 
Planner

planner

If this field is empty, no particular planner is responsible for this plan item.

Calendar
Calendar of Default EU

The calendar of the enterprise unit that you specified in the session for the default warehouse.

Note: 
  • LN uses the enterprise unit calendar for several planning aspects that are not related to a particular resource, business partner, or warehouse.
  • LN uses the enterprise unit calendar when a more specific calendar is not available.

Calendars in Enterprise Planning

Origin

The session where the calendar code originates.

Horizons
Master Plan

Enterprise Planning maintains an item master plan for the item.

Enterprise Planning also maintains a channel master plan for every channel that you linked to the specified plan item in the Plan Item - Channels (cpdsp5100m000) session.

A master plan allows the use of various functions, see: To use master plans.

Note: 
  • If an item master plan is maintained, you can still also use order-based planning.
  • the above-mentioned functions are not available. Order-based planning is the only available planning system for this item.
  • You must only maintain a master plan for an item if you need the described functionality, because it can decrease performance.
  • If the VMI Relation field is Create Supplier Forecast or Receive Customer Forecast, you cannot maintain an item master plan for this item.

This check must be cleared when using Mandatory Project Peg in Items (tcibd0501m000)

Maintain master plan.

To use master plans

Use Time Fence

Select or clear the Use Time Fence check box to indicate whether or not you want to use the specified time fence to plan an individual item.

Enterprise Planning uses the time fence according to the setting of the Generate within in the Generate Order Planning (cprrp1210m000) session to plan orders for an individual item.

For example, when you select zero as time fence and you have a sales demand for yesterday, the planned finish date of the planned order is today, because Enterprise Planning cannot plan in the past.

Enterprise Planning ignores the time fence you defined for the current scenario. In this way you can overrule the setting of the Generate within check box in the Generate Order Planning (cprrp1210m000) session.

Dependent on the settings of both the Generate within check box and the Use Time Fence check box, three situation exist:

  • If you clear the Use Time Fence check box, LN plans within the time fence, and does not take into account the settings of the Generate within check box in the Generate Order Planning (cprrp1210m000) session.
  • If you select the Use Time Fence check box, and you clear the Generate within check box, LN plans outside the time fence.
  • If you select the Use Time Fence check box, as well as the Generate within check box, LN plans within the time fence.

For example, you have a sales demand for yesterday and you disable the time fence field. Enterprise Planning plans the finish date of the planned order for yesterday, because Enterprise Planning can plan in the past in that situation.

Horizons and time fences

Time fences in order planning and in master planning

Time Fence

time fence

Note: You can override the time fence for master-based planning by selecting the Generate within Time Fence check box in the Generate Master Planning (cprmp1202m000) session.

You can override the time fence for order-based planning by selecting the Generate within Time Fence check box in the Generate Order Planning (cprrp1210m000) session.

Note: Although you can define a time fence for purchase schedule items, LN does not take into account the Time Fence field. For the firm part of purchase schedules, LN uses a frozen period. For more information about purchase schedules and time fences, see Purchase schedules and Enterprise Planning.

Horizons and time fences

Simulated time period (RRP run)

Time fences in order planning and in master planning

Purchase schedules and Enterprise Planning

Time Fence Unit

Select Hours or Days as time unit for the time fence.

If you select Hours, LN sets the time fence by taking into account the workable hours, starting from the time point on which LN generates the order planning, and by adding up the value you define in the Time Fence field.

Suppose you set the time fence to 7 hours, and the working hours for every day of the week are from 8:00 am to 17:00 pm. If LN generates the order planning on Wednesday, 13:00 pm, it sets the time fence to Thursday, 11:00 amcprpd1100m000.

Time Fence

The date on which LN sets the time fence.

To find the correct date, LN starts from the current date, and stops after the number of workdays that you defined in the Time Fence field.

Forecast Time Fence

forecast time fence

The forecast time fence is expressed as a number of working days from the date you carry out the planning.

Before the forecast time fence, Enterprise Planning only considers actual customer orders. Beyond the forecast time fence, total demand is a combination of actual orders and forecasts.

A reasonable value for the forecast time fence is the minimum time period between the receipt of customer orders and the requested delivery dates.

To calculate the forecast time fence, LN uses the calendar that you specified for the enterprise unit of the plan item's default warehouse.

If you did not specify an enterprise unit for the default warehouse of the plan item, Enterprise Planning uses the company calendar to calculate the forecast time fence.

Note: 

In master planning, LN ignores the demand forecast up to the end of the plan period in which the time fence falls.

In order-based planning, LN ignores the demand forecast up to the end of the day in which the time fence falls. The demand forecast is taken into account starting 0:00 hours (midnight) of the next day. In order-based planning, the demand forecast consists of special demand.

Forecast Consumption with an Item Master Plan

Time fences in order planning and in master planning

Date

The date on which LN sets the forecast time fence.

To find the correct date, LN starts from the current date, and stops after the number of workdays that you defined in the Forecast Time Fence field.

Order Horizon

order horizon

LN automatically updates the order horizon when you run the Check Horizons (cprpd1200m000) session, if the following conditions are met:

  • The Automate Update Horizons check box is selected.
  • The Update Method in the Check Horizons (cprpd1200m000) session is set to COLT + Horizons When Too Small, or to COLT + All Horizons.

If you set the Update Method field in the Check Horizons (cprpd1200m000) session to COLT + Horizons When Too Small, LN corrects the order horizon when it is too short to correctly create planned orders.

If you set the Update Method field in the Check Horizons (cprpd1200m000) session to COLT + All Horizons, LN corrects the order horizon, regardless of the value in the Minimum Order Horizon field.

Horizons and time fences

Cumulative order lead times and horizons

Date

The date on which LN sets the order horizon.

To find the correct date, LN starts from the current date, and stops after the number of workdays that you defined in the Order Horizon field.

LN takes into account the actual calendar for the enterprise unit calendar of the item's warehouse and the default availability type that you defined in the Planning Parameters (cprpd0100m000) session.

Planning Horizon

planning horizon

LN automatically updates the planning horizon when you run the Check Horizons (cprpd1200m000) session, if the following conditions are met:

  • The Automate Update Horizons check box is selected.
  • The Update Method field in the Check Horizons (cprpd1200m000) session is set to COLT + Horizons When Too Small, or to COLT + All Horizons.

If you set the Update Method field in the Check Horizons (cprpd1200m000) session to COLT + Horizons When Too Small, corrects the planning horizon when it is too short to correctly create an order plan.

  • LN

If you set the Update Method field in the Check Horizons (cprpd1200m000) session to COLT + All Horizons, LN corrects the planning horizon, regardless of the value in the Minimum Planning field.

Horizons and time fences

Cumulative order lead times and horizons

Date

The date on which LN sets the planning horizon.

To find the correct date, LN starts from the current date, and stops after the number of workdays that you defined in the Planning Horizon field, which is comparable to the way that LN finds the correct date of the order horizon.

Production Schedules

The time period for which Enterprise Planning uses planned production schedules to plan the supply.

The production schedule horizon is expressed as the number of working days from the date you execute the simulation.

If the value is zero, Enterprise Planning does not use planned production schedules to plan supply.

To calculate this value, LN uses the calendar specified for the enterprise unit of the default warehouse of the plan item.

Note: This field is applicable only if the Repetitive Production Schedules check box is selected in the Repetitive Manufacturing Parameters (tirpt0100m000)) session.
Operations Horizon

The number of workdays after which the fixed lead-time horizon starts.

Note: The start of the fixed lead-time horizon is rounded to the end of a plan period. Effectively, this means that the fixed lead-time horizon starts at the next plan period.

If the value of this field is greater than the order horizon, this effectively means that no fixed lead-time horizon is used.

Important: If the Operations Horizon field is zero, you cannot transfer the generated planned orders to the execution level, because Enterprise Planning links no routing operations to the planned order. You can use this setting only for simulations.

Start of fixed lead-time horizon.

Production lead-time calculation in Enterprise Planning

Order planning, an overview

Lead Times
Planned Order

Depending on the Actual Supply Source the order lead time for the planned item is determined as follows.

  • If the plan item's Actual Supply Source is Job Shop, the order lead time specified in the Item - Production (tiipd0101m000) session is displayed in this field. This lead time is used for planned production orders within the fixed lead-time horizon.

  • If the plan item's Actual Supply Source is Purchase:

    1. LN determines if any of the suppliers in the Item - Purchase Business Partner (tdipu0110m000) session is specified as Single Source for the plan item. If several lead times are present for the plan item, the first that matches the actual scenario dates is selected.

    2. If no Single Source supplier is present, LN selects a supplier rom the Approved suppliers list in the Item - Purchase Business Partner (tdipu0110m000) session. The selected supplier must be effective for the actual scenario dates of the planned item. The selected supplier must be Preferred.

      If several suppliers fit the specifications, the supplier with the highest Calculated Lead Time (Days) is selected.

    3. If the first two options are not available, the Supply Time from the Items - Purchase (tdipu0101m000) session is taken.

  • If the plan item's Actual Supply Source is Repetitive, the order lead time specified in the Production Model (tirpt2100m100) session is used.

  • If the plan item's Actual Supply Source is Subcontract, the lead time specified in the Product Subcontracting Model (tisub1600m000) session is used.

  • If the plan item's Actual Supply Source is Distribution, the lead time specified in the Supplying Relationships (cprpd7130m000) session is used.

Note: 

To view the breakdown of the components for the selected lead time you can zoom to the Lead-Time Analysis (cprrp1150m000) session.

The order lead time is expressed in days or in hours.

Item purchase data

Production lead-time calculation in Enterprise Planning

Purchase lead time calculation

Inbound

inbound lead time

Outbound

outbound lead time

Safety

safety time

If the Use Item Ordering Data check box in the Item Data by Warehouse (whwmd2110s000) session is selected, the safety time is retrieved from this session. If the check box is cleared, the safety time is retrieved from the Items - Ordering (tcibd2100m000) session.

The safety time is expressed in hours or in days.

Extra Lead Time

extra lead time

If the lead - time is set to 0 it will not taken in to account during order planning.

Fixed Delivery

The fixed-delivery code for this plan item.

If the actual source corresponds with the supply source for which the fixed delivery code is valid, Enterprise Planning generates planned orders for the item. In this case, the finish date equals a fixed-delivery date.

You can link a fixed-delivery types to a pattern in the Fixed Delivery Codes (cprpd2110m000) session.

Note: If this field is empty, fixed delivery is not used for this item.

Defining patterns

Date

The date on which LN sets the start of the fixed lead-time horizon.

COLT
COLT

The cumulative order lead time (COLT) for this plan item.

  • When calculating the purchase item lead time, the Supply Time from the Items - Purchase Business Partner (tdipu0110m000) session is taken into account.
  • When you run the Check Horizons (cprpd1200m000) session, LN automatically updates this field.

Cumulative order lead times and horizons

Calculating purchase item lead times

Lead times and horizons

Full Cumulative Order Lead Time

The full cumulative order lead time (COLT) for this plan item if it must be produced or purchased outside the forecast.

  • This field is only visible if the Use Full Supply Time check box is selected in the Procurement Parameters (tdpur0100m000) session.
  • When calculating the purchase item lead time, the Full Supply Time from the Items - Purchase Business Partner (tdipu0110m000) session is taken into account.
  • When you run the Check Horizons (cprpd1200m000) session, LN automatically updates this field.

Cumulative order lead times and horizons

Calculating purchase item lead times

Non-Critical COLT

The non-critical cumulative order lead time (non-critical COLT) for this plan item.

  • When calculating the purchase item lead time, the Supply Time from the Items - Purchase Business Partner (tdipu0110m000) session is taken into account.
  • When you run the Check Horizons (cprpd1200m000) session, LN automatically updates this field.

Cumulative order lead times and horizons

Calculating purchase item lead times

Lead times and horizons

Full Non-Critical COLT

The full non-critical cumulative order lead time (non-critical COLT) for this plan item if it must be produced or purchased outside the forecast.

  • This field is only visible if the Use Full Supply Time check box is selected in the Procurement Parameters (tdpur0100m000) session.
  • When calculating the purchase item lead time, the Full Supply Time from the Items - Purchase Business Partner (tdipu0110m000) session is taken into account.
  • When you run the Check Horizons (cprpd1200m000) session, LN automatically updates this field.

Cumulative order lead times and horizons

Calculating purchase item lead times

Minimum Order Horizon

order horizon

LN automatically updates the value of the Minimum Order Horizon field when you run the Check Horizons (cprpd1200m000) session, if you selected the Automate Update Horizons check box.

Order horizon.

Horizons and time fences

Cumulative order lead times and horizons

Minimum Planning

planning horizon

LN automatically updates the value of the Minimum Planning field when you run the Check Horizons (cprpd1200m000) session, if you selected the Automate Update Horizons check box.

Planning horizon.

Horizons and time fences

Cumulative order lead times and horizons

Automate Update Horizons

LN automatically updates the order horizon and/or the planning horizon when you run the Check Horizons (cprpd1200m000) session.

Lead times and horizons

Extend ATT Time Fence

Indicate whether you want to specify the available to transfer lead time in days or as a multiplier. The lead time for the available to transfer inventory allows you to transfer cost pegged supply to another peg if the demand for this supply is later than the specified time fence. The time fence is based on the order lead time. You can modify the lead time to add more safety time.

Allowed values

Additional Lead Time
If you select this option, you can specify the additional lead time to include in the ATT Time Fence calculation.
Lead Time Multiplier
If you select this option, you can specify a multiplier on the order lead time for the ATT Time Fence calculation.
Available to Transfer Additional Lead Time
Available to Transfer Lead Time Multiplier
Capable to Promise
Online ATP Update

LN updates the ATP for a plan item online if a planned or actual inventory transaction is recorded for the plan item.

LN updates the ATP over the entire planning horizon, but only in the actual scenario.

Note: 

Online ATP updates require processing power and, therefore, performance. You must only use online ATP updates for:

  • Items for which the CTP is checked online
  • Items for which the CTP is used during distribution planning
  • Business processes that require up-to-date ATP figures
Note: If you use ATP functionality for an item that has no master plan, no online ATP updates are required. In this case, the ATP is always computed online.

Online ATP update.

Online ATP update

CTP Checking Procedure

Critical in CTP

critical in CTP

Note: The performance, specifically the speed, of the component CTP check is greatly influenced by the number of components that are checked. The best approach is to have only the most important components checked.

Capable-to-promise, an overview

Component CTP

CTP Checking Procedure

Component CTP

LN can carry out component CTP checks for this item.

Component CTP

CTP Checking Procedure

Capable-to-promise, an overview

Capacity CTP

LN can carry out capacity CTP checks for this item.

During an ATP check, LN can check the availability of critical resource capacity for additional production. LN only performs a CTP check if the sales order quantity or the quantity you entered in the ATP Handling (cprrp4800m000) session is higher than the item's ATP in the item master plan, and the required quantity cannot be fulfilled by the ATP alone.

The choice of resource to check depends partly on the order horizon:

LN checks the capacity of only the resources for which you selected the Critical in CTP check box in the Work Centers - Planning (cprpd2100m000) session.

LN cannot carry out capacity CTP checks if the resource has no resource master plan.

If LN checked a sales order for capacity CTP, and accepts and records the sales order in Sales Control , LN carries out a capacity CTP reservation on the critical resources so that the resource capacity cannot be given away again.

Capacity CTP

Capacity CTP reservations

To compute capacity CTP

Capable-to-promise, an overview

Channel ATP

LN can carry out channel ATP checks for this item.

Channel ATP

Channel ATP periods

Capable-to-promise, an overview

CTP Time Fence

CTP time fence

LN performs CTP checks between the end of the CTP time fence and the end of the ATP/CTP horizon. After the CTP horizon, LN assumes that capacity and components are infinite.

However, LN does perform ATP checks between the current moment and the end of the CTP time fence and the end of the ATP/CTP horizon.

Capable-to-promise, an overview

Horizons and time fences

CTP Horizon

ATP/CTP Horizon

After the ATP/CTP horizon, LN assumes that capacity and components are infinite.

Important: If you defined this plan item as a alternative material, the value of this field must be greater than the Alternative Materials Horizon in the Scenarios (cprpd4100m000) session. Otherwise, LN erroneously assumes that the alternative material is infinitely available to cover for shortages of the standard material.

CTP horizon.

CTP Checking Procedure

Use-up materials and alternative materials in Enterprise Planning

Master Plan Update
Production Plan

Select one of the four update modes.

Purchase Plan

Select one of the four update modes.

Inventory Plan

Select one of the four update modes.

Demand Forecast

Select one of the four update modes.

Options
Central Multicompany Planning

the item can be planned in a central multicompany planning run.

If you clear the Central Multicompany Planning check box in the Planning Parameters (cprpd0100m000) session, this check box is not available.

Multicompany planning

Exclude from Pegging

LN generates no pegging information for this plan item.

The generation of pegging information can have a negative effect on performance. Select this check box unless you really want to have the pegging information.

Note: This check box is disabled if the plan item is a project pegged item.

Pegging for planned orders

Critical in Master Planning

this plan item is critical in master planning. This means that in the master-planning process in Enterprise Planning , this item is treated as a critical component.

In order planning, all components are taken into account. In master planning, only critical components are considered.

Note: Master planning uses an item's bill of critical materials (BCM) for production planning. As a rule, the BCM is derived from the BOM, and contains only those components that are designated as critical in master planning. You can generate a BCM for an item in the Generate Bill of Critical Materials (cprpd3220m000) session.

Master planning, an overview

Plan Item Text

a text is present.

VMI Relation

The function of this plan item in a vendor managed inventory (VMI) setup. This field determines what VMI-related actions LN must perform during an order-based planning run.

Note: Every time you run order-based planning, LN reevaluates the VMI Relation field. LN takes the entire period between current date and the planning horizon into account. If at any time in that period an applicable terms and conditions agreement is found, the VMI Relation field is set to Create Supplier Forecast or Receive Customer Forecast, even if this terms and conditions agreement is not effective at the current date. In this way, LN makes sure that the order-based planning run executes the VMI-functionality if it is needed.

For information on the method LN uses to evaluate this field, refer to To determine the VMI Relation.

Create Supplier Forecast

You are the customer in a VMI-relationship. The supplier of this plan item also takes care of the supply planning. The order-based planning run can create a forecast that you send to the VMI supplier.

Receive Customer Forecast

You are the VMI supplier for the plan item. You perform the supply planning for this item on behalf of your customer. Possibly, the customer sends you a forecast of the item demand.

Not Applicable

This item is not involved in vendor-managed inventory that is planned by a supplier.

Supply planning by supplier

Determining the VMI Relation

Forecast
Forecast-Based Generation Method

the inventory plan is generated on the basis of the expected demand of the plan item during a certain forecast horizon.

the inventory plan is generated on the basis of the safety stock level and the seasonal pattern.

Inventory planning in Enterprise Planning

Dependent Demand Forecast

the calculation of the demand forecast is based on the historical demand data of both the dependent demand and the independent demand.

the calculation and consumption of the demand forecast is based on the independent demand only.

If the calculation of the demand forecast takes the dependent demand into account, the forecast is also consumed by dependent demand.

To compute the demand forecast

Forecast Consumption with an Item Master Plan

Forecast Horizon

the inventory plan is generated on the basis of the expected demand of the plan item during a certain forecast horizon.

the inventory plan is generated on the basis of the safety stock level and the seasonal pattern.

Inventory planning in Enterprise Planning

Days

The date to which LN sets the forecast horizon.

Family CTP Parameters
Family CTP

LN can carry out family CTP checks for this item.

Capable-to-promise, an overview

Family CTP

Family Company

The family company in which you defined the family item that LN takes into account to perform a family ctp check.

Note: This field is displayed only if the Multicompany Distribution check box is selected in the Planning Parameters (cprpd0100m000) session.

Capable-to-promise, an overview

Family Item

The family item denotes the item to which the CTP check can be redirected.

The item must have been defined in the family company.

The family item can be an item that you defined in another logistical company.

Capable-to-promise, an overview

Family CTP

CTP Time Fence

The number of workdays after which the family CTP horizon starts.

Note: The start of the family CTP horizon is rounded to the end of a plan period. As a result, the family CTP horizon effectively starts at the next plan period.

Capable-to-promise, an overview

Family CTP

Phase Numbers
Master Phase Number

The phase number for master planning.

Planning sequence and phase numbers

Order Phase Number

The phase number for order planning.

Planning sequence and phase numbers

Master Phase Number Parent

This field contains the maximum master phase number of any of the parents of the item in one of the following relationships: BCM or Supplying relationships.

If the value of the Master Phase Number field is smaller or equal to the value of the Master Phase Number Parent field, the master phase number must be recomputed.

You can recompute phase numbers by means of the Compute Phase Numbers (cprpd6200m000) session.

Planning sequence and phase numbers

Net-change phase number computation

Order Phase Number Parent

This field contains the maximum order phase number of any of the parents of the item in one of the following relationships: BOM or supplying relationships.

The default value is -1.

If the value of the Order Phase Number field is smaller or equal to the value of the Order Phase Number Parent field, the phase number must be recomputed.

Planning sequence and phase numbers

Net-change phase number computation

Net Change
Planning Net Change

a change occurred that affects one or both of the following plans:

  • The master planning of the item (for example, a change in the bill of material (BOM).
  • The order planning of the item (for example, a change in the BOM, or the acceptance of a customer order).

Net-change simulations

Simulated time period (RRP run)

Planning Net Change Date

net change date

Pegging Net Change

this plan item must be included in the next net-change pegging update, because the plan item has changed since the previous pegging update.

the Net-change pegging update section in Pegging for planned orders.

Work Load Control
Constraint

the availability of the plan item is a constraint in the planning.

This field is only used in the Workload Control master planning method.

Note: 
  • You can also select the Constraint check box for items to plan them with the Workload Control master-planning method.
  • If the plan item involved is present in more than one planning cluster, you can only have a production plan in one planning cluster, because the warehouse specified in the BOM/BCM determines from which warehouse Enterprise Planning retrieves the components for the plan item involved.

    For a production plan for item X in planning cluster 1 and a production plan for item X in planning cluster 2, LN uses the same BCM warehouse: either in planning cluster 1 or in planning cluster 2.

Workload control

Workload control, to plan against constraints

Master Plan Unit

The plan unit for master planning.

With a master plan unit you can choose a master planning engine for an item.

Note: 

You do not have to enter a plan unit in this field in the following cases:

  • The item is planned with infinite planning (not taking any constraints into account).
  • The item does not have a master plan (the Master Plan check box is cleared).
  • All supply is planned by order planning (the order horizon has the same length as the planning horizon).
  • No production plan is generated, in other words, the Production Plan field has the value No Update or (Dis)aggregate.

Plan units in Enterprise Planning

Rules for defining plan units

Priority

Specify the appropriate level of priority if you selected the Constraint check box.

Enterprise Planning takes into account the priority of a plan item if you use the workload control as master-planning engine, and you selected Yes or Only in the Consider Item Priority field of the Work Load Control Parameters (cpwlc2101m000) session.

Workload control, to compute planning priorities

Related topics
Plan items in Enterprise Planning
Item definition in Enterprise Planning
Multisite overview
Setting up item data for multisite
Item data