tibom domains
- Minimal
- Limited
- Extended
- Method Four
- Method Five
- Create
-
Creates a new layout revision for the target site and assembly line. LN copies the selected source stations and related feed-in lines to the new revision. The effective date is set to the current date. If an approved target revision exists with a future effective date, that date is used.
- Overwrite
-
Deletes the stations and feed-in lines from the selected target layout revision and then copies the selected source stations and related feed-in lines. The target layout header is not changed.
- Add
-
Adds the selected source stations after the existing stations in the target layout revision. LN assigns new position numbers after the highest existing position number and updates the feed-in position accordingly.
- Add as Highest
- Add as Lowest
- Net Quantity
- Scrap Quantity
- Scrap Percentage
- Not Applicable
- Configurable
- Engineering Module
- Standard