Process Rental Quotes (tsepp1203m100)
Use this session to process a range of rental quotes into rental orders. After a rental quote is processed, the status of the rental quote is set to Processed in the Rental Quotes (tsepp1100m300) session. A rental order is created in the Rental Orders (tssoc2100m200) session based on the data specified for the rental quote.
Field Information
- Selection Range
-
- Rented-to Business Partner
- The From and To fields define a range of rented-to business partners linked to the rental quotes.
- Rental Department
- The From and To fields define a range of service departments linked to the rental quotes.
- Rental Quote
- The From and To fields define a range of rental quotes that are processed into rental orders.
- Options
-
- Series for Rental Orders
- The number series used for rental orders created from rental quotes.
- Material Availability
-
- Check ATP Inventory
- If this check box is selected, the ATP Inventory check is performed.
- Skip Blocked Inventory
- If this check box is selected, the blocked inventory is not considered during the process.
- Check Planned Inventory
- If this check box is selected, the planned inventory check is performed.
- Block Processing of Quotes with Shortages
- If this check box is selected, the application blocks quotes with the Inventory Check Status set to Shortage or Supply is late.
- Check On Hand Inventory
- If this check box is selected, the on hand inventory check is performed.
- Scope of Inventory Check
-
The locations where the material availability can be checked.
Allowed values
- All Warehouses in Planning Cluster
-
Checks if the material is available in the warehouse defined on the Material Line.
- Current Warehouse Only
-
Checks if the material is available in one of the warehouses in the same cluster as the warehouse defined on the Material Line.
- Planning Times for Shortage
-
- Update Rental Quote (Lines) with Latest Planned Material Line
- If this check box is selected, the planned start time of the rental quote material lines are updated with the latest planned delivery time of the material lines.
- Synchronize Materials with Latest Planned Material Line
- If this check box is selected, the planned delivery time of all the rental quote material lines are updated with the latest planned delivery time of the material lines.
- Reports
-
- Error Report
- If this check box is selected, an error report is generated if the process is not completed successfully.
- Process Report
- If this check box is selected, a process report is generated if the process is completed successfully.