Creating a physical breakdown from a Bill of Materials

  1. Access the Create Physical Breakdown Structure (tscfg2210m000) session.
  2. Select Bill of Material in the Source field.
  3. Select the Deliveries check box to create a physical breakdown from Sales (after sales). The end item of the sales order, the production BOM is copied to a physical breakdown. If you select this check box, you can use the fields in the Selection Range group box to create a physical breakdown from a range of installation group, items, or serialized items. For this selection range, a physical breakdown is created.
  4. Select the Check Effectivity check box, to check the items validity before the items are copied to physical breakdown.