Print Activity Budgets (tpptc2410m000)
Use this session to print the activity-budget line details for the selected activity (or activities) and project(s).
You can limit the printout by budget line number, cost-type and/or status.
Field Information
- Budget Material Lines
 - 
            
If this check box is selected, the budget lines with a material cost-type are included in the print.
 - Activity Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box.
 - Budget Labor Lines
 - 
            
If this check box is selected, the budget lines with a labor cost-type are included in the print.
 - Cost Object Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box.
 - Budget Equipment Lines
 - 
            
If this check box is selected, budget lines with a equipment cost-type are included in the print.
 - Budget Line Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box.
 - Budget Subcontracting Lines
 - 
            
If this check box is selected, the budget lines with a subcontracting cost-type are included in the print.
 - Budget Sundry Cost Lines
 - 
            
If this check box is selected, the budget lines with a sundry costs cost-type are included in the print.
 - Based on
 - 
            
The indicator for status-related selections.
Not Applicable
All activities and budget lines are included, regardless of their status.
Activities
Only activities with a selected status are included.
Budget Lines
Only budget lines with a selected status are included.
- Not Applicable
 - Activities
 - Budget Lines
 
 - Currency
 - 
            
The home currency. In an independent currency system you can rotate between the company currencies. In a dependent situation you can also rotate but the home currency amount is always calculated with the reference currency and not directly with the rate amount.
 - Free
 - 
            
If this check box is selected, activities or budget lines with the Free status are printed.
 - Actual
 - 
            
If this check box is selected, activities or budget lines with the Actual status are printed.
 - Final
 - 
            
If this check box is selected, activities or budget lines with the status Final are printed.