Rental Resource Lines (tpptc2180m000)
Use this session to view and maintain rental resource lines of a project, linked to a rental template.
Note: The header data of this session is defaulted from the Activity Budget (Equipment) (tpptc2112m000) session and cannot be modified.
Field Information
- General
-
- Project
- The code of the project.
- Plan
- The code of the plan.
- Activity
- The code of the activity.
- Equipment Rental
- The code of the reference activity that is linked to the rental equipment.
- Planned Equipment Request
-
The code of the planned equipment request generated for the rental activity in a project.
Note: This field is displayed only when the Rental Resource Lines (tpptc2180m000) session is accessed from the Planned Equipment Requests (tppss6125m000).
- Budget Details
-
- Quantity
-
The quantity of the rental equipment.
Note: This field is defaulted with the value of the Equipment Quantity field in the Activity Budget (Equipment) (tpptc2112m000) session.
- Cost Amount
-
The sum of the cost amounts of the rental resource lines.
Note: If the quantity of the rental resource lines is modified, the value of cost amount in the budget is recalculated.
- Currency
- The currency in which the cost amount is expressed.
- Line
- The line number of the rental resource line.
- Resource Type
-
The resource type of the reference activity linked to a rental template.
Allowed values
- Labor
-
The overheads are calculated for Labor cost type.
- Overhead
-
The overheads are calculated for Overhead cost type.
- Materials
-
The overheads are calculated for Material cost type.
- Equipment
-
The overheads are calculated for Equipment cost type.
- Subcontracting
-
The overheads are calculated for Subcontracting cost type.
- Sundry Costs
-
The overheads are calculated for Sundry cost type.
- Rental Product
-
If this check box is selected, you can specify a rental product for the rental resource line.
Note: This check box is enabled only if the Resource Type field is set to Equipment.
- Resource Item
-
The rental product specified for the rental resource line.
Note: This field is enabled, if:
- The Resource Type field is set to Materials.
- The Resource Type field is set to Equipment and the Rental Product check box is selected.
- Description
- Resource Cost Object
-
The cost object specified for the rental resource line. This value is based on the resource type.
Note: This field is enabled if the Resource Type field is set to Labor, Equipment, and Sundry Costs.
- Per Unit Quantity
- The quantity required for one unit of rental equipment.
- Total Quantity
-
The total quantity of the resource item or cost object.
Total Quantity = Per Unit Quantity x Equipment Quantity
Note: The equipment line quantity of the equipment budget line or estimate line or planned equipment request from where the rental resource lines session is accessed is considered as Equipment Quantity. - Quantity Unit
-
The unit in which the quantity is expressed.
Note: This field must be specified if the Resource Type is set to:
- Material
- Equipment
- Amount of Time
-
The duration for which the resource is used.
Note: The value in this field is defaulted from the Activity Budget (Equipment) (tpptc2112m000) session.
- Time Unit
-
The unit in which the time is expressed.
Note: This field must be specified if the Resource Type is set to:
- Labor
- Equipment
- Cost Rate
- The cost per unit for the cost object.
- Cost Amount
- The total cost amount for the rental resource line.
- Currency
- The currency in which the cost amount is expressed.
- Cost Component
- The cost component at which the cost control is implemented.
- Description