Print Element Budgets (tpptc1410m000)
Use this session to print the element budget line details for the selected element(s) and project(s).
You can limit the printout by budget line number, cost-type, and/or status.
Field Information
- Budget Material Lines
 - 
            
If this check box is selected, budget lines with a cost-type of material are included in the print.
 - Element Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box.
 - Budget Labor Lines
 - 
            
If this check box is selected, budget lines with a cost-type of labor are included in the print.
 - Cost Object Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box is included in the print.
 - Budget Equipment Lines
 - 
            
If this check box is selected, budget lines with a equipment cost-type are included in the print.
 - Budget Line Text
 - 
            
If this check box is selected, the print includes general text that relates to this check box is included in the print.
 - Budget Subcontracting Lines
 - 
            
If this check box is selected, budget lines with a subcontracting cost-type are included in the print.
 - Budget Sundry Cost Lines
 - 
            
If this check box is selected, budget lines with a sundry costs cost-type are included in the print.
 - Based on
 - 
            
The indicator for status-related selections.
 - Currency
 - 
            
The home currency. In an independent currency system you can rotate between the company currencies. In a dependent situation you can also rotate but the home currency amount is always calculated with the reference currency and not directly with the rate amount.
 - Budget Status 'Free'
 - 
            
If this check box is selected, elements or budget lines with the status Free is printed.
 - Budget Status 'Actual'
 - 
            
If this check box is selected, elements or budget lines with the status Actual is printed.
 - Budget Status 'Final'
 - 
            
If this check box is selected, elements or budget lines with the status Final is printed.