Print Cost Forecast by Cost Object (tpppc2416m000)
Use this session to print the forecast for the final result. You can choose between an overview report or a detailed report.
Field Information
- 
            
- Material
 - 
              
If this check box is selected, the item details are printed.
 - Labor
 - 
              
If this check box is selected, the labor details are printed.
 - Equipment
 - 
              
If this check box is selected, the equipment details are printed.
 - Subcontracting
 - 
              
If this check box is selected, the subcontracting details are printed.
 - Sundry Cost
 - 
              
If this check box is selected, the sundry cost details are printed.
 - Overhead
 - 
              
If this check box is selected, the overhead cost forecast details are printed.
 
 - 
            
- Only Unapproved
 - 
              
If this check box is selected, only the unapproved cost details are included in the report.
 - Current Forecast
 - 
              
If this check box is selected, the current cost forecasts are included in the report.
 - Text
 - 
              
If this check box is selected, the specified text is printed.
 
 - 
            
- Currency
 - 
              
Choose the currency you want to print your report in.
 - Description
 - 
              
The description or name of the code.