Data setup
          You can use the MAS functionality only if the Materials at Site check box is selected in the Contract Parameters (tpctm0100m000) session.
          
         
           Note: This check box is displayed only if the Scope Of Work check box is selected in the Contract Parameters (tpctm0100m000) session.
          
         
          You can also use the MAS functionality for a specific contract line by selecting the Materials at Site check box in the Contract Lines (tpctm1110m000) session.
          
        
           Note: This check box is enabled only if: 
           
         - The Scope of Work Applicablecheck box is selected on the Contract Billing tab, in the Contract Lines (tpctm1110m000) session.
 - The status of the contract line is set to Free.