Initiate Schedule Line Material Issue (tirpt4221m000)
Use this session to manage the issue of non-backflush schedule line material.
           Note: Use the Backflush Schedule Line Materials (tirpt4221m100) to manage blackflush schedule line materials.
          
         Field Information
- Site
 - 
            
The site ID.
Note: Only visible if multisite functionality is active. - Production Schedule
 - Schedule Position
 - 
            
The material's position in the production schedule.
 - Work Cell
 - To Date/Time
 - 
            
The date and time to which schedule line materials are issued.
 - Issue Sequence
 - 
            
The sequence in which the materials are issued.
 - Print Report
 - 
            
If this check box is selected, a material issue report is printed.
 - Print errors only
 - 
            
If this check box is selected, a report of the material issue errors is printed.