Change Job Shop Operations (tirou4201m000)
Use this session to perform a change in content on a series of Job Shop Routing Operations. At a time, you can perform a change in only one field of an operation. If three fields of an operation are to be changed, the session must be run three times, using the same Change Note. You can either create a new change note to link the change or choose an existing note that is open.
Field Information
- Change Note
-
- Change Note Selection
-
Indicate if the change is to be performed on a new or existing change note.
Allowed values
- New
- A new change number is generated.
- Add to Note
- The change is added to an existing change note.
- Not Applicable
- Change Note
-
The code of the change note.
Note:
- This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- This field is enabled only if the Change Note Selection field is set to Add to Note.
- Reason
-
The reason for performing the change.
Note: This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- New Revision
-
- Effective Date
- The date and time from when the change is effective.
- Target Routings
-
- Site
- The site ID.
- Work Center
-
The code of the work center.
Note: The work center must be linked to the specified Site.
- Machine Type
-
The machine type used in the work center. The machine capacity group is defined by the work center and the machine type.
Note:
- You must specify this value if the Machine Capacity Groups check box is selected in the Work Center (tirou0601m000) session.
- The combination of Site, Work Center, and Machine Type must exist for the combination in the Machine Capacity Groups.
- Reference Operation
-
The code of the reference operation.
Note: The Reference Operation must exist for the specified combination of Site, Work Center, and Machine Type.
- Routing Code
-
The routing code.
Note: This value can be defined only if the Work Center and the Reference Operation are specified.
- Change Value
-
- Change Value
- If this check box is selected, you can specify the values by which the job shop operation field must be changed.
- Change Sign
-
Indicate if you must change any values by increasing or decreasing the unit of an operation such as Queue time, Move time, and Wait time.
Allowed values
- Increase
- Decrease
- Not Applicable
- Operation field
-
The job shop operation field that requires to be changed.
Note:- This field is enabled only if the Change Value check box is selected.
- The Number of Machines option is enabled only if the Machine Type is specified.
- Labor Resources for Setup and Labor Resources for Production options are enabled only if theWork Center Type is other than Subcontracting in the Work Centers (tirou0101m000) session.
Allowed values
- Setup Time
- Cycle Time
- Number of Machines
- Labor Resources for Setup
- Labor Resources for Production
- Queue Time
- Wait Time
- Move Time
- With
-
The value by which the operation time must be changed.
Note: This field is enabled only if the Change Value check box is selected.
- Units
-
The unit in which the value for the operation field must be expressed.
Note: This field is enabled only if the Change Value check box is selected.
Allowed values
- Percent
- FTE
- Minutes
- Hours
- Days
- Machines
- Set New Value
-
- Set New Value
- If this check box is selected, you can specify a new value for the required job shop operation field.
- New Operation Field
-
The job shop operation field for which the new value must be set.
Note: This field is enabled only if the Set New Value check box is selected.Allowed values
- Setup Time
- Cycle Time
- Number of Machines
- Labor Resources for Setup
- Labor Resources for Production
- Queue Time
- Wait Time
- Move Time
- To
-
The new value for the job shop operation field.
Note: This field is enabled only if the Set New Value check box is selected.
- Units
-
The unit in which the value is expressed.
Note: This field is enabled only if the Set New Value check box is selected.
Allowed values
- Percent
- FTE
- Minutes
- Hours
- Days
- Machines
- Options
-
- Approve New Revision
- If this check box is selected, the new revision is approved.
- Simulate
-
If this check box is selected, the change is not processed, but a report shows the revisions that are to be changed.
Note: By default, this check box is selected.
- Print Process Report
-
If this check box is selected, a report is printed when the process is completed.
Note: By default, this check box is selected if the Simulate check box is selected, and you cannot clear the check box.