Correct Calculated Lead Time for Job Shop Routings (tirou4200m300)
Field Information
- Site
 - 
            
The site for which the routing lead time is calculated.
 - From
 - 
            
The range of products for which the routing lead time is calculated.
 - Routing
 - 
            
The range of routings for which the lead time is calculated.
 - Revision
 - 
            
The product revision for which the routing lead time is calculated.
 - Status
 - 
            
The status of the routing for which the lead time is calculated.
Allowed values
- 
              
New
The routing was generated but has not yet been approved. - 
              
Approved
The routing is approved and is in use. - 
              
Expired
The routing has expired and can no longer be used. 
 - 
              
 - 
            
- Automatic
 - 
              
If this check box is selected, lead times are only calculated with routings with the lead time calculation method Automatic.
 - Manual with zero Lead Time
 - 
              
If this check box is selected, lead times are only calculated for routings with the lead time calculation method set to Manual or zero lead time.
 
 - 
            
- Simulation
 - 
              
If this check box is selected, the routing lead times calculation is simulated and no changes are made.
 - Print Report
 - 
              
If this check box is selected, a report is printed once the lead time calculation is completed.