Change Production Bill of Materials (timfc3210m200)

Use this session to change the material line data of Production BOMs. You can change only one component of a BOM material line at a given point of time. Every time a component is changed, you must run the session, using the same Change Note. You can either create a new change note to link the change or select an existing note that is open.

You can modify this data:

  • Value of Net Quantity
  • Value of Scrap Percentage
  • Value of Scrap Quantity
  • Alternative Materials
  • Reference Designator
Note: This session can only be accessed if the the Job Shop by Site concept is set to Active in the Implemented Software Components (tccom0100s000) session.

Field Information

Change Note
Change Note Selection

Indicate if the change is to be performed on a new or existing change note.

Allowed values

New
A new change number is generated.
Add to Note
The change is added to an existing change note.
Not Applicable
Change Note
The code of the change note.
Note: 
  • This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
  • This field is enabled only if the Change Note Selection field is set to Add to Note.
Reason
The reason for the change.
Note: 

This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.

New Revision
Effective Date
The date and time from when the change is effective.
Target BOMs
Material
The code of the item for which material line you can change the value.
From Product
The range of products for which you can change value.
Change Value
Change Value
If this check box is selected, you can specify the values by which the production BOM field must be changed.
Change Value Option
Indicate how the value(s) of the Production BOM material line field is changed (by increasing or decreasing the value by unit or percentage. For example, Scrap quantity, Net quantity, and Scrap percentage.
Note: This field is enabled only if the Change Value check box is selected.

Allowed values

Increase
Decrease
Not Applicable
Material Line Option
The production BOM material line field that must be changed.
Note: This field is enabled only if the Change Value check box is selected.

Allowed values

Net Quantity
Scrap Quantity
Scrap Percentage
Not Applicable
With
The value by which the target material line must be changed.
Note: This field is enabled only if the Change Value check box is selected.
Unit
The option in which the change value for the target material line field must be expressed.
Note: This field is enabled only if the Change Value check box is selected.

Allowed values

Units
Percent
Set New Value
Set New Value
If this check box is selected, you can set a new value for the selected BOM material line field.
Set Option
The production BOM material line field for which the new value must be set.
Note: This field is enabled only if the Set New Value check box is selected.

Allowed values

Net Quantity
Scrap Quantity
Scrap Percentage
Not Applicable
To
The new value set for the job shop operation field.
Note: This field is enabled only if the Set New Value check box is selected.
Units
The option in which the new value for the target material line must be expressed.
Note: This field is enabled only if the Set New Value check box is selected.

Allowed values

Units
Percent
Change Content
Change Content
If this check box is selected, the alternative material or reference designator details can be updated.
Alternative Material
Indicate if the alternative material can be added or reassigned.
Note: This check box is enabled, only if the Change Contentcheck box is selected.
Change Content Sign

Indicate if you must add or reassign the alternative material.

Allowed values

Add
Reassign
Not Applicable
Material
The code of the item used as the alternative material that must be added or reassigned.
Note: This field is enabled only if the Alternative Material check box is selected.
Priority
The priority of the alternative material that must be within the range of 1 to 9.
Note: This field is enabled only if the Alternative Material check box is selected.

Allowed values

Use up
This is an outdated material (use-up material) that must be used up first.
Original
The standard item is used as the alternative material.
1
The alternative that is selected if the inventory of the standard material (and the use-up material, if any) is insufficient.
2
The alternative that is selected if the inventory of the standard material and the first alternative material (and the use-up material, if any) is insufficient.
3
Lower priority alternative materials.
4
Lower priority alternative materials.
5
Lower priority alternative materials.
6
Lower priority alternative materials.
7
Lower priority alternative materials.
8
Lower priority alternative materials.
9
The lowest priority alternative material.
Swap
The alternative item is swapped with the standard item.
Reference Designator
If this check box is selected, the reference designator must be added.
Note: This check box is enabled, only if the Change Content check box is selected.
Reference Designator
The code of the reference designator that must be added.
Note: 
  • The Reference Designator must exist in the Reference Designators (tcmcs0190m000) session.
  • This field is enabled only if the Reference Designator check box is selected.
Quantity
The quantity of reference designators that must be added.
Note: This field is enabled only if the Reference Designator check box is selected.
Options
Approve New Revision
If this check box is selected, the new revision is approved.
Simulate
If this check box is selected, the change is not processed, however, a report of the revisions that are to be changed, is generated.
Note: By default, this check box is selected.
Print Process Report
If this check box is selected, a report is printed when the process is completed.
Note: By default, this check box is selected if the Simulate check box is selected, and you cannot clear the check box.