Item Surcharges (ticpr1110m100)
Use this session to view and maintain item surcharges. Item surcharges are indirect costs of an item, such as overhead costs, building costs, development costs, or general costs that are not related to material handling. Costs that need to be included in the standard cost by enterprise unit can be defined as item surcharges.
Field Information
- Cost Calculation Code
- The cost calculation code that is used to calculate the standard cost of the item.
- Level
-
The level on which the item surcharge is defined. You can define item surcharges on four levels.
Allowed values
- 1 - Enterprise Unit - Item
- 2 - Enterprise Unit - Item Group
- 3 - Item
- 4 - Item Group
- All Levels
Note: You can select the level of the item surcharge from the menu. - Enterprise Unit
- The code of the enterprise unit for which the item surcharge is defined.
- Item
-
The item for which the surcharge is defined. Surcharges defined by item have higher priority during the cost price calculation.
Note: This field is enabled only if a value is not specified in the Item Group field.
- Item Group
-
The item group for which the surcharge is defined.
Note: This field is enabled only if a value is not specified in the Item field.
- Description
- Booking Triggered By
-
Indicate whether the surcharges are used in the calculation of cost prices during the receipt or the issue of an item.
Allowed values
- Receipt
- Surcharges are added to the valuation prices during the receipt of the item into a warehouse.
- Issue
- Surcharges are added to the valuation prices when issuing the item from a warehouse.
Note: Item surcharges are used to calculate the standard cost regardless of the surcharge being triggered during the issue or receipt of an item. - Sequence Number
- The sequence number of the surcharge line.
- Overview
-
- Calculation Line Type
-
Indicate if the surcharge is used in the calculation of the cost price of an item.
Allowed values
- Surcharge
-
This is the regular line type for defining surcharges.
- Subtotal
-
The surcharge are displayed as a subtotal on printed reports.
- Cumulative Cost
-
Both the surcharges of the previous period and the scheduled surcharges for the next period are taken into account during calculation and are printed on report as a total.
Note:- If this field is set to Subtotal, the application displays the multi-level cost price on the report and the surcharge is not applied to the calculation lines in the Print Multilevel Cost Calculation (ticpr2420m000) and the Print Cost Calculation (ticpr2410m000) sessions.
- If this field is set to Cumulative Cost, the application displays the cumulative cost price and the surcharge is not applied to the calculation lines in the Print Multilevel Cost Calculation (ticpr2420m000), Print Cost Calculation (ticpr2410m000), and Print Estimated Cost Calculation by Project (tipcs3471m000) sessions.
- Surcharge Method
-
The method used to calculate the item surcharge.
Allowed values
- Fixed Amount
-
The surcharge expressed as a fixed amount can be positive or negative. If negative, the item surcharge base discount is considered.
- % of Total Costs
-
The surcharge is a percentage of the total costs as included in the cost calculation.
Note: LN does not include surcharges that must be calculated in the surcharge on the total costs, because they are not known at that moment. The surcharge percentage can be positive or negative. In the latter case, it is in effect a discount. - % of Added Costs
- The surcharge is a percentage of the added costs. Added costs are direct operation costs at the highest level in the product structure and cost surcharges.
- % Selective (Total Costs)
- The surcharge is a percentage of the item's total cost structure. You can use the Surcharge Bases (ticpr1120m000) session to specify the cost components to which the surcharge must be applied.
- % Selective (Added Costs)
- The surcharge is a percentage of selected operation costs of the item.
- Variable Cost
-
If this check box is selected, the surcharge is considered as a variable cost during the standard cost calculation of an item. If this check box is cleared, the surcharge is considered as a fixed cost.
Note: Fixed costs are included in the standard cost of a project only if the Include Fixed Costs in Project Valuation check box is selected in the Project Control Parameters (tipcs0100m00) session.
- Surcharge Component
-
The cost component to which the item surcharge is linked.
Note: You can specify a cost component for which the Cost Type is set to Surcharge.
- Surcharge Amount
-
The item surcharge expressed as an amount.
Note: You can specify a value in this field only if:
- The Calculation Line Type field is set to Surcharge.
- The Surcharge Method field is set to Fixed Amount.
- Currency
- Currency
- The currency in which the item surcharge is expressed.
- Surcharge Percentage
-
The item surcharge expressed as a percentage.
Note: You can specify a value in this field only if:
- The Calculation Line Type field is set to Surcharge.
- The Surcharge Method field is set to Fixed Amount.
- Surcharge Bases Present
-
If this check box is selected, a surcharge base is defined in the Surcharge Bases (ticpr1120m000) session. You can select a surcharge line and use the option from the menu to access the Surcharge Bases (ticpr1120m000) session.
Note: You can define surcharge bases for the surcharge lines with the Surcharge Method set to Selective (Total Costs) or Selective (Added Costs).