Print Job Shop Bills of Material (tibom3400m000)
Use this session to to print reports for a selected job shop bill of material in the specified site. The bill of material report can be single level or multi level.
- The lowest level of components. The multilevel print displays all items, including the intermediate products (subassemblies).
- The procured parts, that is the components with the Source set to a value other than Job Shop Bill of Material in the Job Shop Bill of Material (tibom3600m000) session.
- This session is displayed only if the Job Shop by Site concept is set to Active or In Preparation in the Concept Activation (tcemm4600m000) session.
- You can only print the current revisions with summarized quantities option.
- If BOMs are selected in the Job Shop Bills of Material (tibom3100m000) session, the print includes only the selected BOMs. If there is no selection, the print includes the entire list.
- By default, the quantities are printed on the report.
Field Information
- Site
-
The site for which the report is printed.
- From Product
-
The range of product.
- Bill of Material
-
The range of production models.
- Configuration
-
Use this field to determine which BOM lines are printed with respect to effectivity units.
- Effectivity Unit
-
The effectivity unit ID.
- Report Level
-
Select the level of detail printed.
Allowed values
- Single Level
- Multi Level
- Report Type
-
Select the type of report printed.
Note:- If this field is set to Dimensions, the report displays the length and width of the item.
- The Summarized Quantities option is enabled only if the Report Level field is set to Multi Level.
- The multi-level summarized quantities report displays the sum of the quantities for the lowest level of component.
- For a summarized quantities report, you can only print:
- Current revisions of the job shop BOM.
- Item Texts.
- If this field is set to Summarized Quantities, you cannot print the additional BOM data.
Allowed values
- Quantities
- Summarized Quantities
- Dimensions
- Revisions Shown
-
Select the type of revisions shown.
Allowed values
- Current Revisions
- Effective Revisions
- All Revisions
- Alternative Materials
-
If this check box is selected, the alternative materials that are linked to the BOM are printed in the report.
- Use Up Materials
-
If this check box is selected, the use-up materials that are linked to the BOM are printed in the report.
- Reference Designators
-
If this check box is selected, all reference designators linked to the job shop bill of material are printed.
- Material - Routing Relationships
-
If this check box is selected, all material-routing relationships linked to the job shop bill of material are printed.
- BOM texts
-
If this check box is selected, any text associated with the job shop bill of materials is printed.
- Item texts
-
If this check box is selected, then any texts associated with items will be printed.
To create or edit item text:
- Start the Items (tcibd0501m000) session.
- Double click an item
- Click Text
- Print Language for Texts
-
Enter the code for the language in which you want to print the texts that you have previously selected.
If none of the check boxes for printing texts are selected, you cannot enter a code.