Replace Item in Job Shop Bill of Materials (tibom3210m300)

Use this session to replace an item, for multiple Job Shop BOMs with a new material item for a range of products.

Note: This session can only be accessed if the Job Shop by Siteconcept is set to Active in the Implemented Software Components (tccom0100s000) session.

Field Information

Change Note
Selection

Indicate if the change is to be performed on a new or existing change note.

Allowed values

New
A new change number is generated.
Add to Note
The change is added to an existing change note.
Not Applicable
Change Note
The code of the change note.
Note: 
  • By default, the value is set to New. This is the only value which is allowed.
  • The New option is displayed only if theChange Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
Reason
The reason for the change.
Note: 
  • This field is displayed is displayed only if theChange Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
  • This value cannot be modified.
New Revision
Effective Date
The date and time from when the change is effective.
Target BOMs
Site
The site ID.
Material
The code of the item that is replaced.
From Product
The range of products which the job shop BOMs with the selected material that is replaced.
Replacement Data
Replacement Item
The code of the new item.
Use Up Inventory
If this check box is selected, the current available inventory is used before the issue of the replacement item.
Options
Approve New Revision
If this check box is selected, the new revision is approved.
Simulate
If this check box is selected, the change is not processed, however, a report of the revisions that are to be changed, is generated.
Note: By default, this check box is selected.
Print Process Report
If this check box is selected, a report is printed when the process is completed.
Note: By default, this check box is selected if the Simulate check box is selected, and you cannot clear the check box.