Change Job Shop Bill of Materials (tibom3210m200)
Use this session to mass change a material line data of Job Shop BOMs. You can change only one component of a BOM material line at a given point of time. Every time a component is changed, you must run the session using the same Change Note. You can either create a new change note to link the change or select an existing note that is Open.
You can modify this data:
- Value of Net Quantity
- Value of Scrap Percentage
- Value of Scrap Quantity
- Alternative Materials
- Reference Designator
Field Information
- Change Note
-
- Change Note Selection
-
Indicate if the change is to be performed on a new or existing change note.
Allowed values
- New
- A new change number is generated.
- Add to Note
- The change is added to an existing change note.
- Not Applicable
- Change Note
-
The code of the change note.
Note:
- This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- This field is enabled only if the Change Note Selection field is set to Add to Note.
- Reason
-
The reason for the change.
Note:
This field is displayed only if the Change Notes Active check box is selected in the Product Engineering Parameters (timfc0100m000) session.
- New Revision
-
- Effective Date
- The date and time from when the change is effective.
- Target BOMs
-
- Site
- The site ID.
- Material
- The code of the item for which material line you can change the value.
- From Product
- The range of products for which you can change value.
- Change Value
-
- Change Value
- If this check box is selected, you can specify the values by which the job shop BOM material line field must be changed.
- Change Value Options
-
Indicate how the values of the job shop BOM material line field is changed by increasing or decreasing the value by unit or percentage of the bill of materials. For example, Scrap quantity, Net quantity, and Scrap percentage.
Note: This field is enabled only if the Change Value check box is selected.Allowed values
- Increase
- Decrease
- Not Applicable
- Material Line Options
-
The job shop BOM material line field that must be changed.
Note:This field is enabled only if the Change Value check box is selected.
Allowed values
- Net Quantity
- Scrap Quantity
- Scrap Percentage
- Not Applicable
- With
-
The value by which the target material line field must be changed.
Note: This field is enabled only if the Change Value check box is selected.
- Unit
-
The option in which the change of value for the target material line must be expressed.Note: This field is enabled only if the Change Value check box is selected.
Allowed values
- Units
- Percent
- Set New Value
-
- Set New Value
- If this check box is selected, you can set a new value for the selected job shop BOM material line field.
- Set
-
The job shop BOM material line field for which the new value must be set.Note: This field is enabled only if the Set New Value check box is selected.
Allowed values
- Net Quantity
- Scrap Quantity
- Scrap Percentage
- Not Applicable
- To
-
The new value set for the target job shop BOM material line field.
Note: This field is enabled only if the Set New Value check box is selected.
- Unit
-
The option in which the new value for the target material line field must be expressed.Note: This field is enabled only if the Set New Value check box is selected.
Allowed values
- Units
- Percent
- Change Content
-
- Change Content
- If this check box is selected, the warehouse, alternative material, or reference designator details can be updated.
- Logistics
- If this check box is selected, the warehouse can be added or reassigned.
- Warehouse
- The code of the warehouse.
- Alternative Material
- Indicate if the alternative material can be added or reassigned to the target job shop BOM material line.
- Change Content Sign
-
Indicate if you must add or reassign the alternative material.
Allowed values
- Add
- Reassign
- Not Applicable
- Material
-
The code of the item used as the alternative material that must be added or reassigned.
Note: This field is enabled only if the Alternative Material check box is selected.
- Priority
-
The priority of the alternative material that must be set within the range of 1 to 9.Note: This field is enabled only if the Alternative Material check box is selected.
Allowed values
- Use up
- This is an outdated material (use-up material) that must be used up first.
- Original
- The standard item is used as the alternative material.
- 1
- The alternative that is selected if the inventory of the standard material (and the use-up material, if any) is insufficient.
- 2
- The alternative that is selected if the inventory of the standard material and the first alternative material (and the use-up material, if any) is insufficient.
- 3
- Lower priority alternative materials.
- 4
- Lower priority alternative materials.
- 5
- Lower priority alternative materials.
- 6
- Lower priority alternative materials.
- 7
- Lower priority alternative materials.
- 8
- Lower priority alternative materials.
- 9
- The lowest priority alternative material.
- Swap
- The alternative item is swapped with the standard item.
- Reference Designator
-
If this check box is selected, the reference designator can be added to the target job shop BOM material line.
Note: This check box is enabled only if the Change Content check box is selected.
- Reference Designator
-
The code of the reference designator that must be added.
Note:
- The Reference designator must exist in the Reference Designators (tcmcs0190m000) session.
- This field is enabled only if the Reference Designator check box is selected.
- Quantity
-
The quantity of reference designators that must be added.
Note: This field is enabled only if the Reference Designator check box is selected.
- Logistics
-
- Options
-
- Approve New Revision
- If this check box is selected, the new revision is approved.
- Simulate
-
If this check box is selected, the change is not processed, however, a report of the revisions that are to be changed, is generated.
Note: By default, this check box is selected.
- Print Process Report
-
If this check box is selected, a report is printed when the process is completed.
Note: By default, this check box is selected if the Simulate check box is selected, and you cannot clear the check box.