Process Control (qmptc1117m000)
Use this session to to create and maintain process capability control chart.
Field Information
- Origin
 - 
            
The origin of the order.
Allowed values
- Sales
 - Storage Inspection
 - Production (RPT)
 - Routing (RPT)
 - Service
 - Warehouse Transfer
 - Maintenance Sales
 - Batch Repair
 - Maintenance Work
 - Purchase
 - Warehouse Transfer (Manual)
 - Not Applicable
 - Production (JSC)
 - Material (BOM)
 - Routing (TI)
 - Sales Schedule
 - Project
 - Purchase Schedule
 - Project Contract
 - EP Distribution
 - Inventory Inspection
 
 - Item
 - 
            
The code of the item.
 - Description
 - 
            
The description or name of the code.
 - Business Partner
 - 
            
The buy-from business partner/ sold-to business partner.
Note: If you set the origin order to Purchase, you must enter a buy-from business partner in this field. If you set the origin order to Sales, you must enter a sold-to business partner in this field. - Description
 - 
            
The description or name of the code.
 - Aspect
 - 
            
The code of the aspect.
 - Description
 - 
            
The description or name of the code.
 - Characteristic
 - 
            
The code of the characteristic.
 - Description
 - 
            
The description or name of the code.
 - Process Control Chart Type
 - 
            
The type of process control chart that must be generated.
Allowed values
- Xbar and R Control
 - Not Defined
 - Xbar and S Control
 - XM and R Control
 
 - Calculated Deviation Upper Control Limit
 - 
            
The calculated deviation upper control limit.
 - Calculated Deviation Center Line
 - 
            
The calculated deviation center line.
 - Calculated Deviation Lower Control Limit
 - 
            
The calculated deviation lower control limit.
 - Target Deviation Upper Control Limit
 - 
            
The target deviation upper control limit.
 - Target Deviation Center Line
 - 
            
The target deviation center line.
 - Target Deviation Lower Control Limit
 - 
            
The target deviation lower control limit.
 - Base Date From
 - 
            
The date from which the process capability control chart is generated.
 - Base Date To
 - 
            
The date up to which the process capability control chart is generated.
 - Calculated Mean Upper Control Limit
 - 
            
The upper control limit.
 - Calculated Mean Center Line
 - 
            
The actual measured mean of the process.
 - Calculated Mean Lower Control Limit
 - 
            
The lower control limit.
 - Target Mean Upper Control Limit
 - 
            
The upper control limit.
 - Target Mean Center Line
 - 
            
The actual measured mean of the process.
 - Target Mean Lower Control Limit
 - 
            
The lower control limit.