Scheduled Work Team (plsch2631m000)
Use this session to view and maintain work teams with a scheduled start and end date. A scheduled work team is a work team for which work is scheduled to start but has not yet started or a work team for which work is in process.
These sessions are displayed as satellite sessions:
- Scheduled Resources by Work Team (plsch2132m000)
- Scheduled Setups by Work Team (plsch2133m000)
Field Information
- Scenario
- Description
- Work Team
- The code of the work team.
- Production Order
- The code of the production order.
- Operation
- The code of the production order operation.
- Quantity
- The quantity remaining to be produced by the work team, if work has started or the quantity scheduled to be produced by the work team, if work has not yet started.
- Start Date
- The scheduled start date and time of work if work has not yet started or the actual start date and time of work if work has started.
- End Date
- The scheduled end date and time of work as determined by the Synchronized Scheduling Engine.
- Duration
- The total scheduled duration of work by the work team.
- Duration Unit
-
...
Allowed values
- Seconds
- Minutes
- Hours
- Days
- Weeks
- Team Status
-
...
Allowed values
- Historic
- Forecast
- Work Team Type
-
Type of work team.
Allowed values
- Setup
- A set of resources (employees, machines, and/or tools) required to carry out the work specified for the order. Items are not produced during the setup.
- Production
- A set of resources (employees, machines, and/or tools) that perform the actual production work required to produce the items for the Production order operations .
- Wait
- Scheduled batch
- The batch number associated with the work team. If Synchronous Batching is used the manufacturing order step quantity can be divided into batches. The batch number sequentially increase by one with each schedule calculation. If Synchronous batching is not implemented, this value is set to 0.
- Qualified Team
- The code of the qualified team.