Production Order (plsch2600m000)

Use this session to view and maintain the production order data.

These sessions are displayed as satellite sessions:

  • Production Order Operation (plsch2605m000)
  • Transactions (plsch1110m000)

Field Information

Scenario
The code of the scenario.
Site
The code of the site linked to the item.
Production Order
The code of the production order.
Priority
The priority assigned to the production order. Manually entered production orders can be assigned a priority ranging from 1 (highest priority) to 9 (no priority).
Project
The code of the project linked to the production order.
Note: This field is displayed only if a project is attached to the production order.
Item
The code of the item for which the production order is created.
Warehouse
The code of the warehouse linked to the item.
Routing
The code of the routing.
Revision
Description
BOM Model
The model number of the bill of material, if existing.
BOM Revision
The revision number of the bill of material.
Multi Quantity UOM
Description
Schedule Start Date Backup
Schedule End Date Backup
Linked Orders
Linked Production Order
The code of the linked production order, if existing.
Linked Production Order Operation
The operation number associated with the linked production order.
Status
Status Date
The date and time when the status of the production order is updated.
Initial Date
The original planned end date specified when the production order is created. However this date can be modified by the Scheduling Engine or another user.
Exclude from Scheduling

Indicates if the production order is excluded from the scheduling run when a new schedule is generated.

Planned Start Date
The date on which start of production is planned as determined by the Production Planner.
Planned End Date
The date on which end of production is planned as completed by the Production Planner.
Scheduled Start Date
The production start date as defined by the Scheduling Engine. Scheduled dates are calculated based on various manufacturing constraints, such as the availability of resources, setup times, production rates, completion of operations, planned dates, efficient use of resources, reduction of setups and reduction of work in process.
Scheduled End Date
The production end date defined by the Scheduling Engine.
Quantities
Quantity Unit
The unit in which the quantity is expressed.
Total Quantity
The total quantity to be produced for the production order. This quantity equals to the To Process quantity when the production is yet to start.
To Process Quantity
The quantity to be produced for the Production order. If production is initiated for the order, this quantity remains yet to be produced (as calculated from production feedback specified for Production Order Operations of the Production order).

This value must be specified manually when the production order is created. As the production progresses, the value is updated automatically by the application.

This value is the quantity ordered for the line item if the order is created for a make-to-order customer order line item and this value cannot be modified.

In-Process Quantity
The quantity of items that are currently in production on the shop floor for the Production order operations.
Processed Quantity
The quantity that is produced for the production order. This value is automatically updated from production feedback for operations in the production order.