Production Order Operations (plsch2105m000)

Use this session to view production order operations. You can also assign a qualified team to the operation.

Field Information

Scenario
The code of the scenario.
Production Order
The code of the production order.
Operation Block
The code of the operation block.
Operation
The code of the operation.
Qualified Team
The code of the qualified team assigned to the operation.
Note: Only Standard and Synchronous Batching operations need to have a qualified team.
Alternative Routing Block
Indivisible Group
The code of the indivisible group linked to the operation, if existing.
Production Order Operation Group

The code of the production order operation group linked to the production order operation.

Step Number
Multiplier
The operational multiplier as defined in the process routing for the operation. This value is determined by the number of times the operation must be carried out to produce an item.
Quantity Unit
The unit in which the quantity in expressed.
To Process Quantity
The quantity that is yet to be produced for the production order step.
Note: This value is updated by the application as the work progresses and production feedback is specified for the production order step.
Processed Quantity
The quantity produced for the production order step.
Total Quantity
Rejected Quantity
The total number of defective items that are discarded during production. This value is updated by the application when production feedback is specified.
Forecasted Reject
The quantity of defective items that are forecasted as Rejects from the total quantity during production. This quantity is calculated based on the reject rate and constant specified in the manufacturing process routing, for the operation.
First Lot End Date
The date and time when the first lot of the production order step, is completed.
Previous Scheduled Start Date
The scheduled start date of the production order step in the last schedule that is calculated and saved. This enables a comparison between the scheduled start date and the newly scheduled start date.
Previous Scheduled End Date
The scheduled start date of the production order step in the last schedule that is calculated and saved. This enables a comparison between the scheduled start date and the newly scheduled start date.
Planned Start Date
The date on which production is planned to start, as determined by the Production Planner. This date is generated with a delivery schedule. However you can aslo specify the date.
Planned End Date
The date on which production is planned to end, as determined by the Production Planner. This date is generated with a delivery schedule. However you can aslo specify the date.
Leveled Start Date
Leveled End Date
Scheduled Start Date
The production start date as defined by the Scheduling Engine. Scheduled dates are calculated based on various manufacturing constraints, such as the availability of resources, setup times, production rates, completion of operations, planned dates, efficient use of resources, reduction of setups and reduction of work in process.
Scheduled End Date
The production end date defined by the Scheduling Engine.
Status

The status of the operation (Production Order Step).

Allowed values

To Do
The production order step is created. Work on the production order step can start immediately, without any restrictions.
An order step with this status can be manually set to Delayed or Postponed.
Delayed
Work on the Production order step cannot start until the specified date.
Note: The production order step is set to this status automatically when a transfer time is defined for the operations.
For example, if you report feedback on Operation1 of Production order operations 10 and this operation has a transfer delay, Production order operations 20 is delayed by the time taken by the Operation1 delay (the delay triggered when production feedback is reported).
Postponed

Work on the production order is to be postponed by a fixed time from the scheduled start date at each schedule calculation.

The time period by which a production order is postponed is determined by the Earliest Starting Time for Postponed production orders parameter.

An order step can be manually set to this status. This status is applicable when a decision about the completion of the work is yet to be taken.

In Process
Work is In Process for the Production order operations but has not yet been completed. This status is automatically entered by the software when production feedback is entered on the work teams of Production order operations .

The production order step is set to this status by the application, when the production feedback is specified on the work teams of the production order operations associated with the production order.

To Restart

The production order that is previously suspended is scheduled by the application. When a Production order operations is restarted, forecasted transactions and transactions in the bill of material are regenerated. Production order step with Suspended status can be manually set to this status.

Suspended

Work on the production order cannot be started until the specified date.

Production orders with these status can be Suspended:

  • In Process
  • Partially in Process
  • To Restart
  • Partially to Restart
Completed
The total quantity of the production order operations step has been produced. You can close a Production order operations by setting the status to Completed. However this is not recommended.
Recommended
Production order step is generated for a production order and has not yet been confirmed. You can confirm a production order step with this status by manually changing the status to To Do.

Production order step with this status can be manually set to:

  • Delayed
  • Postponed
  • Completed
Status Date
The date and time when the status of the production order operation is updated.
Dates
Q Start Date
Setup Start Date
Run Start Date
Wait Start Date
Move Start Date
Schedule Start Date Backup
Schedule End Date Backup
Multiplier type

...

Allowed values

Constant
Quantity MO
Group Sequence Number
The order in which the operation steps in the group are completed.
In Process Batch Quantity
The quantity that is currently being processed for the production order operations step in a batch.
Note: This value is applicable only to Production order operations corresponding to Synchronous batching operations.
Predecessor Max Completed Date
Frozen

Indicates if the production order step is frozen. Steps can be frozen in the Gantt chart.

No Stretch

...