Employee Model (plsch0635m000)
Use this session to view and maintain employee models. Employees linked to the model are also displayed.
           Note: The Employee (plsch0634m000) session is displayed as satellite session.
          
         Field Information
- Scenario
 - The code of the scenario linked to the employee.
 - Employee Model
 - The model number linked to the employee.
 - Time Loss
 - The resource-specific weight for reducing time loss. This value determines the significance of reducing time loss when a machine is selected by the Engine for scheduling. The Scheduling Engine considers this value on addition to the other weights.