Employee Model (plsch0635m000)

Use this session to view and maintain employee models. Employees linked to the model are also displayed.

Note: The Employee (plsch0634m000) session is displayed as satellite session.

Field Information

Scenario
The code of the scenario linked to the employee.
Employee Model
The model number linked to the employee.
Time Loss
The resource-specific weight for reducing time loss. This value determines the significance of reducing time loss when a machine is selected by the Engine for scheduling. The Scheduling Engine considers this value on addition to the other weights.