Employee (plsch0634m000)
Use this session to view and maintain the employee details.
Note: The Employee Model (plsch0635m000) is displayed as satellite session.
Field Information
- Scenario
- The code of the scenario linked to the employee.
- Infinite Capacity
-
Indicates if the employee with infinite capacity is available from the beginning of the schedule. Consequently, more than one manufacturing order step can be scheduled at the same time for the employee.
- Employee
- The code of the employee.
- Name
- The name of the employee.
- Calendar Code
- The code of the calendar to which the employee is linked.
- Availability Type
- The code of the Availability Type associated with the employee.
- Time Loss
- The resource-specific weight for reducing time loss. This value determines the significance of reducing time loss when a machine is selected by the Engine for scheduling. The Scheduling Engine considers this value on addition to the other weights.
- Experience
- The work experience of the employee expressed in years or months.
- Experience Unit
-
...
Allowed values
- Months
- Years
- Hourly Standard Cost
- The hourly wage for using the resource. Overhead costs, if attributed to manpower, must also be considered.
- Currency
- Wait After
-
The process step for which the Wait Time can be applied.
Allowed values
- Production
- Setup
- Setup and Production
- Wait Time
- The time for which the employee is unavailable after completing the Production or Setup work.
- Wait Time Unit
-
...
Allowed values
- Seconds
- Minutes
- Hours
- Days
- Weeks
- Levelling Constraint
-
...
- General
-
- Weights
-