Periods (plsch0112m000)
Use this session to define work periods for a specific calendar and availability type.
Field Information
- Scenario
 - The code of the scenario.
 - Calendar Code
 - The code of the calendar for which the periods are defined.
 - Availability Type
 - The code of the availability type linked to the calendar.
 - Date
 - The date from which the work period starts.
 - Sequence
 - Start Time
 - The period start time.
 - End Time
 - The period end time.
 - Shift Name
 - The name of the shift assigned to the period.
 - Working Hours Type
 - The type of working hours.
 - Capacity Percentage
 - The capacity of the resource, expressed as a percentage.
 - Efficiency Factor
 - 
            The efficiency factor of the resource. This value can be either zero or a positive integer. A value of zero indicates that the resource is not available in the specified period. A value between 0 and 1 indicates that the resource operates at a reduced productivity rate. A value higher than 1 indicates that the resource operates at an increased productivity rate.
            
Example: The standard production rate of a machine is 100 units per hour. If you define an efficiency of 0.8 for the month of July, the Scheduling Engine uses a production rate of 80 units per hour for the month of July.
If multiple resources from a qualified team have an efficiency specified for the same period of time, the lowest efficiency is considered. In case efficiency is not specified for a resource, a value of 1 is considered.