Resource Utilization Performance (plaps8505m200)

Use this session to view the resource plan efficiency and identify major resource constraints. You can use this session to view the summary of capacity utilization, resource overload, and causes of lateness for the specified time period.
Note: You can set a resource overload threshold in the Resource Utilization Performance Options (plaps0695m100)session.

Resource Utilization Heatmap

The heatmap displays the resources utilized in the time period based on the selected site. You can view these details of a resource by hovering over a resource:
  • Site
  • Resources
  • Available
  • Used
  • Utilization percentage
  • CO Allocation
  • Warehouse Demand Allocation
You can right-click on the detailed view and select:
  • Resource Utilization to view details of the resource utilization on the Resource Utilization (plaps8505m000) session.
  • Resource Plan to view details of the resource plan on the Resource Plan (plaps8505m100) session.

Resource Utilization Performance Filters

The resources are displayed in a tree structure, categorized by site. You can select one or more resources to view the utilization percentage over a period of time.

Resource Utilization Performance - Grid

The grid displays a time-phased view of the resources linked to the selected sites and the data related to availability, utilization, and production of the resources in theMost Important Constraints tab. The causes of lateness related to resources are displayed in the Causes of Lateness tab.
Note: You can enable these tabs by selecting the Hide/Show Indicator toggle.

Resource Utilization Performance - Options

You can use the Resource Utilization Options (plaps0181m000) session to define the default settings for the time horizon, causes of lateness, the threshold for overload, and the color legend based on which the resource utilization session is displayed.