Plan Item (plaps1635m000)

Use this session to to view a plan item.

Field Information

ID
The ID of the plan item.
Plan Item
The name of the plan item.
Description
The description of the plan item.
Warehouse
The ID and the name of the warehouse.
Warehouse
The description of the warehouse.
Item - Planning
Site
The code of the site.
Parent Site
The code of the parent site.
Default Warehouse
The code of the item default warehouse.
Forecast Time Fence
The duration of the Forecast Time Fence.
Firming Time Fence
The duration of the Firming Time Fence.
Confirmation Time Fence
The duration of the Confirming Time Fence.
Items
ERP Item Type

The item type used in the data source (an ERP or legacy system).

Allowed values

Undefined
Family
Generic
Standard
Customized STO
Customized ETO
SIC
MRP
MPS
UOM
The unit of measure.
Derived From
The warehouse item from which the current project warehouse item is derived.
Item - Costing
Standard Cost
The standard unit production cost of the item.
Item - Sales
Sales Price
The standard unit price the item is to be sold.
Currency
The currency type to be considered.
Item - Warehouse
Inbound Lead Time
The duration of the Inbound Lead Time.
Outbound Lead Time
The duration of the Outbound Lead Time.
Plan Item Default Warehouse
The ID of the default warehouse associated with the plan item.
Planning Plan Item Group
The Plan Item Group.
On Hand Quantity All Warehouse
The total quantity of items available within all warehouses.
Total Supply Quantity All Warehouse
The total quantity of supply available within all warehouses.
Total Release Supply Quantity All Warehouses
The total quantity of released supply available within all warehouses.
Total Demand Quantity All Warehouses
The total quantity of demand within all warehouses.
Plan Item Type

The item type to be included in the plan.

Allowed values

Family
SKU
Project SKU
Plan Item Family
The family item for the plan.
Item - Ordering
Default Planner
The name or ID of the default planner.
Minimum Order Quantity
The minimum quantity of an item that must be ordered.
Maximum Order Quantity
The maximum quantity of an item that can be ordered.
Order Grouping Horizon
The period of the Order Grouping Horizon.
Order Quantity Increment
The quantity by which the supply order quantity must be a multiplied.
Order Quantity Method

The Order Quantity Method.

Allowed values

Based On Max Level
Based On Bucket Type
Based On Demand
Safety Time
The duration of the Safety Time.
Safety Stock
The duration of the Safety Stock.
Quantity
Build Quantity
The number of units to be produced or assembled in a production run.
On Hand Quantity

The total quantity of an item currently available in inventory.

Note: This includes the quantities on the shop floor that are waiting to be used in various processes (the WIP quantities).
To Receive PO Quantity
The total quantity of items to be received from the purchase order.
To Receive DO Quantity
The total quantity of items to be received from the delivery order.
To Ship DO Quantity
The total quantity of items to be shipped from the delivery order.
To Ship CO Quantity
The total quantity of items to be shipped from the customer order.
To Ship Forecast Quantity
The total quantity of items planned to be shipped based on sales forecasts.
To Produce Quantity
The total quantity of items scheduled to be manufactured or produced.
To Consume Quantity
The total quantity of items planned to be used or consumed in production or other processes.
To Increase Quantity
The quantity by which the inventory or stock of an item is planned to be increased.
Total Demand Quantity
The total number of requested items.
To Decrease Quantity
The quantity by which the inventory or stock of an item is planned to be decreased.
Total Supply Quantity
The total number of available items.
Total Released Supply Quantity
The total quantity of the item that is released.
Firm Allocation On Hand Quantity
The total quantity of items available in inventory for specific orders.
Temp Allocated On Hand Quantity
The quantity of items temporarily reserved from the on-hand inventory for specific orders.
General
Constraint Type

The Constraint Type.

Allowed values

Within Planning Horizon
Never
Within Time Fence
Constraint Time Fence
The duration of the Constraint Time Fence.
Low Level Code
The sequence of orders, allowing for sorting from customer orders to purchase orders or vice versa.
ERP Default Supply Method

The default method used for supplying items in an ERP.

Allowed values

Job Shop
Subcontracting
Purchase
Distribution
RCM Allocation Type

The type of allocations to generate by the Requirements engine when recommending new supply.

Allowed values

None
Temporary
Firm
Firm Except Forecast
Sourcing Selection Method

The method that determines which sourcing process to be used by the Requirements engine for a specific item.

Allowed values

Default
The usual sourcing process defined for the item.
Maximum Weight
The sourcing process with the highest specified weight.
Balance Load
The specified sourcing processes, in proportion with the weight.
Maximum ATP
The sourcing process of the site with the maximum Available To Produce (ATP).
Minimum Cost
The the sourcing process incurring the least cost.
Minimum Supply Time
The the sourcing process with the lowest lead time.
Minimum Transportation Cost ATP
The sourcing process of the site with the minimum transportation cost to fulfil ATP requirements.
Dependant Demand Consume Forecast

If this field is set to Yes, enables the consumption of item forecasts by dependent demand.

Allowed values

Yes
No
Item Family

The Item Family.

Inventory Plan Policy

The Inventory Plan Policy.

Safety Stock Use

The consideration of the safety stock items in the overall calculation of the inventory plan.

Allowed values

Ignore
The value of the safety stock is not considered.
Enforce
The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
Add To Inventory Plan
The value of the safety stock is added to the value of the inventory plan.
Confirming Time Fence PO
The period during which the status of purchase orders is changed to Confirmed.
Expedite Tolerance
The period used to determine the necessity to expedite supply.
Postpone Tolerance
The period used to determine the necessity to postpone supply.
Default Supply Method

The standard method used to supply items or services within a warehouse.

Allowed values

Manufacturing
Subcontracting
Purchasing
Distribution
Item
The code of the item to be supplied.
Item
The description of the item.
Default Supplier
The code of the default supplier for the item.
Co Product
The code of another item produced during the manufacturing process of the main item.
Lead Time
The estimated time required to carry out a process.
Resource
The code of the resource to be used in the item production.
Resource
The description of the resource.