Plan Item Group (plaps1625m000)

Use this session to view an item group, which reduces the workload of maintaining information.

Field Information

ID
The ID of the plan item group.
Plan Item Group
The name of the plan item group.
Description
The description of the plan item group.
Plan Item Group Type

The plan item group type.

Allowed values

Co Product
Planning Plan Item Group
BO Buyer
BO Planner
RCM Allocation Type

The type of allocations to generate by the Requirements engine when recommending new supply.

Allowed values

None
Temporary
Firm
Firm Except Forecast
Sourcing Selection Method

The method that determines which sourcing process to be used by the Requirements engine for a specific item.

Allowed values

Default
The usual sourcing process defined for the item.
Maximum Weight
The sourcing process with the highest specified weight.
Balance Load
The specified sourcing processes, in proportion with the weight.
Maximum ATP
The sourcing process of the site with the maximum Available To Produce (ATP).
Minimum Cost
The the sourcing process incurring the least cost.
Minimum Supply Time
The the sourcing process with the lowest lead time.
Minimum Transportation Cost ATP
The sourcing process of the site with the minimum transportation cost to fulfil ATP requirements.
Dependent Demand Consume Forecast

If this field is set to Yes, enables the consumption of item forecasts by dependent demand.

Allowed values

Yes
No
User Controlled

Allowed values

Yes
No
Safety Stock Use

The consideration of the safety stock items in the overall calculation of the inventory plan.

Allowed values

Ignore
The value of the safety stock is not considered.
Enforce
The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
Add To Inventory Plan
The value of the safety stock is added to the value of the inventory plan.
Inventory Plan Policy
The code for the Inventory Plan Policy.
Forecast Time Fence
The time period in which forecasts are disabled.
Firming Time Fence
The time period in which planned supply must be confirmed to Firm Planned.
Confirming Time Fence
The time period in which planned supply must be confirmed to Firm Planned.
Confirming Time Fence PO
The time period during which the status of supply orders (excluding purchase orders) is changed from Planned or Firm Planned to Confirmed.
Expedite Tolerance
The time period used to determine the necessity to expedite supply.
Postpone Tolerance
The time period used to determine the necessity to postpone supply.