Plan Item Group (plaps1625m000)
Use this session to view an item group, which reduces the workload of maintaining information.
Field Information
- ID
- The ID of the plan item group.
- Plan Item Group
- The name of the plan item group.
- Description
- The description of the plan item group.
- Plan Item Group Type
-
The plan item group type.
Allowed values
- Co Product
- Planning Plan Item Group
- BO Buyer
- BO Planner
- RCM Allocation Type
-
The type of allocations to generate by the Requirements engine when recommending new supply.
Allowed values
- None
- Temporary
- Firm
- Firm Except Forecast
- Sourcing Selection Method
-
The method that determines which sourcing process to be used by the Requirements engine for a specific item.
Allowed values
- Default
- The usual sourcing process defined for the item.
- Maximum Weight
- The sourcing process with the highest specified weight.
- Balance Load
- The specified sourcing processes, in proportion with the weight.
- Maximum ATP
- The sourcing process of the site with the maximum Available To Produce (ATP).
- Minimum Cost
- The the sourcing process incurring the least cost.
- Minimum Supply Time
- The the sourcing process with the lowest lead time.
- Minimum Transportation Cost ATP
- The sourcing process of the site with the minimum transportation cost to fulfil ATP requirements.
- Dependent Demand Consume Forecast
-
If this field is set to Yes, enables the consumption of item forecasts by dependent demand.
Allowed values
- Yes
- No
- User Controlled
-
Allowed values
- Yes
- No
- Safety Stock Use
-
The consideration of the safety stock items in the overall calculation of the inventory plan.
Allowed values
- Ignore
- The value of the safety stock is not considered.
- Enforce
- The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
- Add To Inventory Plan
- The value of the safety stock is added to the value of the inventory plan.
- Inventory Plan Policy
- The code for the Inventory Plan Policy.
- Forecast Time Fence
- The time period in which forecasts are disabled.
- Firming Time Fence
- The time period in which planned supply must be confirmed to Firm Planned.
- Confirming Time Fence
- The time period in which planned supply must be confirmed to Firm Planned.
- Confirming Time Fence PO
- The time period during which the status of supply orders (excluding purchase orders) is changed from Planned or Firm Planned to Confirmed.
- Expedite Tolerance
- The time period used to determine the necessity to expedite supply.
- Postpone Tolerance
- The time period used to determine the necessity to postpone supply.