Site (plaps1605m000)
Use this session to view the logistical data for a business location (site) of an enterprise. Sites are used to model the supply chain in a multisite environment.
Field Information
- Site
- The code of the site.
- Description
- The description of the site.
- General
-
- Time Zone
- The time zone of the site.
- Default Calendar
- The default calendar used for scheduling and planning activities at the site.
- Calendar Code
- The code or name of the selected calendar.
- Description
- The name or description of the selected calendar for the warehouse.
- Logistic Company
- The code of the logistic company.
- Expedite Tolerance
- The time period used to determine the necessity to expedite supply.
- Postpone Tolerance
- The time period used to determine the necessity to postpone supply.
- Generate RCM
-
If this field is set to Yes, recommendations are generated for items that are not specifically overridden at the current level.
Allowed values
- Yes
- No
- RCM Allocation Type
-
The type of allocation to generate by the Requirements engine when recommending new supply.
Allowed values
- None
- Temporary
- Firm
- Firm Except Forecast
- Site Group
- The code of the site group.
- Country
- The country code for the site group.
- Sourcing Selection Method
-
The method that determines which sourcing process to be used by the Requirements engine for a specific item.
Allowed values
- Default
- The usual sourcing process defined for the item.
- Maximum Weight
- The sourcing process with the highest specified weight.
- Balance Load
- The specified sourcing processes, in proportion with the weight.
- Maximum ATP
- The sourcing process of the site with the maximum Available To Produce (ATP).
- Minimum Cost
- The the sourcing process incurring the least cost.
- Minimum Supply Time
- The the sourcing process with the lowest lead time.
- Minimum Transportation Cost ATP
- The sourcing process of the site with the minimum transportation cost to fulfil ATP requirements.
- Dependent Demand Consume Forecast
-
If this field is set to Yes, enables the consumption of item forecasts by dependent demand.
Allowed values
- Yes
- No
- Safety Stock Use
-
The consideration of the safety stock items in the overall calculation of the inventory plan.
Allowed values
- Ignore
- The value of the safety stock is not considered.
- Enforce
- The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
- Add To Inventory Plan
- The value of the safety stock is added to the value of the inventory plan.
- Forecast Time Fence
- The time period in The moment in time up to which forecasts are disabled.
- Firming Time Fence
- The time period in which planned supply must be confirmed to Firm Planned.
- Confirming Time Fence
- The time period during which the status of supply orders (excluding purchase orders) is changed from Planned or Firm Planned to Confirmed.
- Confirming Time Fence PO
- The time period during which the status of purchase orders is changed from Planned or Firm Planned to Confirmed.
- Order
-
- Next Purchase Order Number
- The next sequential number to be assigned to a new purchase order.
- Next Distribution Order Number
- The next sequential number to be assigned to a new distribution order.
- Next Manufacturing Order Number
- The next sequential number to be assigned to a new manufacturing order.
- Next Substitution Order Number
- The next sequential number to be assigned to a new substitution order.