Product BOM (pdpdm1151m000)

Use this session to view and maintain product boms.

Field Information

Site
The name of the production site.
Parent Item
The code of the parent item.
Revision
The revision number of an item.
Bill of Material
The code of the bill of material (BOM).
Status

The status of an item.

Allowed values

Draft
Released
Under Change
Obsolete
Find No.

The number that enables you to compare the Item attributes and the attributes of the linked properties.

Component

The code of the item component.

Warehouse
The default warehouse in which the item is stored.
Net Quantity

The quantity of an item.

Scrap Quantity
The item quantity that is considered as scrap.
Unit of Measure
The unit of measure used for the item.
BOM Unit
The BOM unit to be defined at the component level.
Scrap Percentage
The percentage of the item value that is considered as scrap.
Length
The length of the item.
Width
The width of the item.
Size Unit
The additional information related to item.
Number of Units
The number of units of the item.
Operation
The action to be performed on the selected field or column.
Phantom

If this check box is selected, the item is considered as a phantom item.

Skip to Production

If this check box is selected, the item skips to production.

Standard Configuration

Indicates if the item is produced with a standard configuration.

Engineering Parent Item
Engineering Parent Revision
Engineering Find No.
BOM Line Text
The additional information required for the task.
PLM Project

The PLM project for which the BOM is created.

CAD Instance Name
The name of the variant in the CAD family.
Compliance Status

The item's compliance according to RoHS directive.

Allowed values

No Data
Pass
Pass with Exemptions
Fail
Conditional Fail
Partial Fail
Not Relevant
Not Applicable
Link Effective From

The date from which the BOM is effective.

Link Effective To

The date up to which the BOM is effective. The application sets the date when a new revision of the item is released.

Originating App

The application using which the BOM is created.

Allowed values

ECM
MSProject
IMAN
UG Manager
Inventor
ME10
Altium
DraftSight
Jvue Markup
SolidWorks
ERP
AutoCAD
SolidEdge
ProE
Ug
PLM
MSOffice
CatiaV5
CatiaV4
E-Source
Lotus Notes
CRM
MSWord
MSExcel
MSPowerPoint
MSOutlook
Approval Date
The date on which the BOM is released.
Security Access Level

The level of security access provided to the user.

Allowed values

Unrestricted
Restricted
Confidential
Secret
Top Secret
Created By
The name of the user who creates the BOM.
Item Type

The item type used for the project.

Allowed values

Purchased
Engineering Module
Manufactured
Product
Generic
Created On
The date and time when BOM is created.
Previous Revision
The alpha numeric code of the existing revision of the document.
Derived From
The original item from which this item is copied.
The original item revision from which this file is derived.
Category
The code of the item category.
The name of the item category.
Business Process
The business process for which the item is required.
Modification
The code of the modification.
Standard
The standard of the item.
Serialized

If this check box is selected, the item is serialized.

Lot Control
If this check box is selected, the item is lot controlled.
End Item
If this check box is selected, the item is an End item.
Cost
The cost of the item.
Currency
The currency in which the item cost is specified.
Obsolete

Indicates that the item is no longer in use.

In House

The warehouse in which the item is stored.

Allowed values

PLM Origin

The item is created in PLM.

ERP Origin

The item is created in Infor LN.

Deleted
Estimated Weight
The estimated weight of the manufactured item.
Customizable

Indicates if the item is customized.

Allowed values

make-to-order
anonymous item
Size
The default size of the item.
Material
The material from which the item is manufactured.
Search Key 1
The search key used for the retrieval of the item.
Search Key 2
The search key used along with Search Key 1 and Signal Code to retrieve the item.
Engineering Item Reference
The reference number of the engineering item.
ERP Project
The ERP project for which the item is created.
Engineer
The code of the employee who is assigned the engineer's role.
Life Cycle

The stage at which the parent item is, in the production life cycle. This is used to track the item through the various phases (from design to production).

Allowed values

In Design
Approved to Production
Released to Production
Object Type

The category of the object.

Allowed values

Item
Folder
Maintenance Sales Order
Maintenance Sales Order Item Lines
Bill of Material
Contracts
Inspection Plans
Inspection Plan Characteristics
Serial End Item Header
Serial End Item Components
Opportunity
Warehouse Order
Business Process
Planned Order
Purchase Requisition Order
Incident Number CAR
Incident Number CAR1
Incident Number CAR2
Incident Number CAR3
CUSAI Number
Planned Item
ERP Work Center
Instruments
Tool
Installation
Adjustment Order
Adjustment Order Line
Warehouse Receipt
Match Approve Pur Inv
Manufacturer
Supplier
Contractor
Category
File
Hardcopy
Business Process Comment
ECM File
ECM Document
Purchase Order
Purchase Order Line
Sales Order
Sales Order Line
Production Order
Service Order
Routing
Routing Line
Fixed Asset
Sales Quotation
Sales Quotation Line
Purchase Inquiry
Purchase Inquiry Line
ECM Project
Charge Element
Employee
Business Partner
Customer Business Partner
Supplier Business Partner
LOT
Abstract Items
Configuration Items
Service Order Activity
Project (TP)
Project (PCS)
E Item
P Item
Service Installation
Installation Component
Customize Routing
Customize Routing Line
ERP Task
Generic
ERP Machine
Customized Item
Service Call
Service Contract
Service Contract Quote
Service Order Quote
Service Quote Activity
Reference Activity
ECO
Budget
Feature
Calculation Part
Routing Sheet Budget
Routing Sheet Operation
Sales Activity
Purchase Requisition
Purchase Req Line
SCH Sales Contract
SCH Sales Contract Line
SCH Purchase Contract
SCH Purchase Cont Line
Option
NCR
Abstract File
Abstract Document
Abstract BP
Illustration
Material
Formula
Markup
Tessellation
Plan Material Purchase Order
Project Activity
Labor Budget
Equipment Budget
Subcont Budget
Sundry Budget
Purchase Advice
Purchase Advice Line
Material Requisition
Work Breakdown Structure
System
Document
System Part
Space
Received Invoices
Received Pur Invoices
Received Pur Inv Line
Serialized Items
Serial Numbers
Physical Breakdowns
Work Order
Work Order Activities
Activity/Element
The default code of the project element / activity linked to the item.
Long Lead Item

If this check box is selected, the item is the long lead item.

NSN
Drawing Reference
The drawing reference is an alpha numeric text.
Effectivity Indicator

...

Allowed values

Date
Unit
Volume
The volume of the item.
Item Character

The category to which the item is related.

Allowed values

Engineering Item
Product
Package
Label
Standard Component
WBS

Used for Project integration to define project structure. For WBS of Item character, Budget Element ID is mandatory.

WP

Used for Project integration to define project structure. For WP of Item character, Budget Element ID is mandatory.

Project Item

Used for Project integration to define the project material or items.

Tool
Generic
Feature
Option
Phantom

If this check box is selected, the item is considered as a phantom item.

Recyclability

The level of recycling of the item.

Allowed values

R1
R2
R3
Service

If this check box is selected, the item is a Service item and is included in the BOM for future maintenance and repairs.

Locked By
The name of the user who has locked the item.
Originating Item

Indicates if the item is the basic model in the associated CAD system to which all the other members in the category are related.

Logistic Template
The default logistic template for the item.
Create CAD File

Indicates if CAD file must be created for the item.

Allowed values

Yes
No
Yes (Create Assembly)
State

The physical state of the item.

Allowed values

Solid
Solution
Powder
Steam
Melted
Liquid
Expiry Period
The time duration by when the item expires.
Expiry Duration Units

The units in which time duration is expressed.

Allowed values

Minute
Hour
Day
Week
Month
Formula Type

The type of formula.

Allowed values

General
Master
Site
Control
Unit
The quantity of the item on which the engineering BOM is based. The main purpose of this unit is to include very small quantities of a component in the engineering BOM.
Quantity Basis

...

Allowed values

Batch Percentage
Weight Percentage
Ratio
Primary Formula

...

Configuration
The configuration ID.
Quote
Quote Revision
Certified Date
The date on which the item is declared as certified for the first time in PLM.
Assessment Date
The date on which the item is last assessed.
Compliance Comment
The information related to item compliance or non-compliance.
Exemption Reason
The code of the reason if compliance Status is compliant with exemptions.
Unit Effective

If this check box is selected, the Unit Effectivity Series and Unit Sequences are defined for the item.

Interchangeable

Indicates if the unit of the item is interchangeable. This field is relevant only if unit effectivity is applicable for the item.

Series Present

...

Product Class
The product class code associated with the item.
Product Line
The product line code associated with the item.
Planner
The code of the employee performing the planner's role.
Product Code
The product code associated with the item.
Item Group
The code of the item group. Sets of items are grouped on the basis of common features.
Product Type
The code of the product type of the item.
Selection Code
The selection code of the item.
Signal Code
The signal code associated with the item.
BOM Quantity
The quantity of item in the BOM.
Unit Set
The code of the unit set.
Manufacturer
The default manufacturer of the selected component item.
Weight Unit
The unit of weight of the item.
Cage Code

The unique Commercial and Government Entity Code, or CAGE Code, assigned to suppliers associated with various government or defense agencies.

Allowed values

Cage Code 1
Warehouse
The default warehouse in which the item is stored.
Mass Gravity Unit
Volume Gravity Unit
Assessment By
The login ID of the person implementing the change.
Is Latest

Indicates if the revision of the item is the latest.

Use-Up Item
The ID of the item that can replace the item specified in the Assembly Part field.

A material from the previous bill of material (BOM) revision, which is now a use-up material. As long as inventory is available this item can be used instead of the material item.

Note: This option is enabled only if Use-Up Materials check box is selected in the Users PLM Preferences (pdadm0102m200) session.
Status

The status of an item.

Allowed values

Draft
Released
Under Change
Obsolete
Status
The status of an item.

Allowed values

Draft
Released
Under Change
Obsolete
BOM Status

The status of BOM.

Allowed values

Draft
Approved
Component
Use Up
Alternatives Present

...

Reference Designators Present

...

Text

Indicates if text is present for the item.