Product BOM (pdpdm1151m000)
Use this session to view and maintain product boms.
Field Information
- Site
 - The name of the production site.
 - Parent Item
 - The code of the parent item.
 - Revision
 - The revision number of an item.
 - Bill of Material
 - The code of the bill of material (BOM).
 - Status
 - 
            
The status of an item.
Allowed values
- Draft
 - Released
 - Under Change
 - Obsolete
 
 - Find No.
 - 
            
The number that enables you to compare the Item attributes and the attributes of the linked properties.
 - Component
 - 
            
The code of the item component.
 - Warehouse
 - The default warehouse in which the item is stored.
 - Net Quantity
 - 
            
The quantity of an item.
 - Scrap Quantity
 - The item quantity that is considered as scrap.
 - Unit of Measure
 - The unit of measure used for the item.
 - BOM Unit
 - The BOM unit to be defined at the component level.
 - Scrap Percentage
 - The percentage of the item value that is considered as scrap.
 - Length
 - The length of the item.
 - Width
 - The width of the item.
 - Size Unit
 - The additional information related to item.
 - Number of Units
 - The number of units of the item.
 - Operation
 - The action to be performed on the selected field or column.
 - Phantom
 - 
            
If this check box is selected, the item is considered as a phantom item.
 - Skip to Production
 - 
            
If this check box is selected, the item skips to production.
 - Standard Configuration
 - 
            
Indicates if the item is produced with a standard configuration.
 - Engineering Parent Item
 - Engineering Parent Revision
 - Engineering Find No.
 - BOM Line Text
 - The additional information required for the task.
 - PLM Project
 - 
            
The PLM project for which the BOM is created.
 - CAD Instance Name
 - The name of the variant in the CAD family.
 - Compliance Status
 - 
            
The item's compliance according to RoHS directive.
Allowed values
- No Data
 - Pass
 - Pass with Exemptions
 - Fail
 - Conditional Fail
 - Partial Fail
 - Not Relevant
 - Not Applicable
 
 - Link Effective From
 - 
            
The date from which the BOM is effective.
 - Link Effective To
 - 
            
The date up to which the BOM is effective. The application sets the date when a new revision of the item is released.
 - Originating App
 - 
            
The application using which the BOM is created.
Allowed values
- ECM
 - MSProject
 - IMAN
 - UG Manager
 - Inventor
 - ME10
 - Altium
 - DraftSight
 - Jvue Markup
 - SolidWorks
 - ERP
 - AutoCAD
 - SolidEdge
 - ProE
 - Ug
 - PLM
 - MSOffice
 - CatiaV5
 - CatiaV4
 - E-Source
 - Lotus Notes
 - CRM
 - MSWord
 - MSExcel
 - MSPowerPoint
 - MSOutlook
 
 - Approval Date
 - The date on which the BOM is released.
 - Security Access Level
 - 
            
The level of security access provided to the user.
Allowed values
- Unrestricted
 - Restricted
 - Confidential
 - Secret
 - Top Secret
 
 - Created By
 - The name of the user who creates the BOM.
 - Item Type
 - 
            
The item type used for the project.
Allowed values
- Purchased
 - Engineering Module
 - Manufactured
 - Product
 - Generic
 
 - Created On
 - The date and time when BOM is created.
 - Previous Revision
 - The alpha numeric code of the existing revision of the document.
 - Derived From
 - The original item from which this item is copied.
 - The original item revision from which this file is derived.
 - Category
 - The code of the item category.
 - The name of the item category.
 - Business Process
 - The business process for which the item is required.
 - Modification
 - The code of the modification.
 - Standard
 - The standard of the item.
 - Serialized
 - 
            
If this check box is selected, the item is serialized.
 - Lot Control
 - If this check box is selected, the item is lot controlled.
 - End Item
 - If this check box is selected, the item is an End item.
 - Cost
 - The cost of the item.
 - Currency
 - The currency in which the item cost is specified.
 - Obsolete
 - 
            
Indicates that the item is no longer in use.
 - In House
 - 
            
The warehouse in which the item is stored.
Allowed values
- PLM Origin
 - 
              
The item is created in PLM.
 - ERP Origin
 - 
              
The item is created in Infor LN.
 - Deleted
 
 - Estimated Weight
 - The estimated weight of the manufactured item.
 - Customizable
 - 
            
Indicates if the item is customized.
Allowed values
- make-to-order
 - anonymous item
 
 - Size
 - The default size of the item.
 - Material
 - The material from which the item is manufactured.
 - Search Key 1
 - The search key used for the retrieval of the item.
 - Search Key 2
 - The search key used along with Search Key 1 and Signal Code to retrieve the item.
 - Engineering Item Reference
 - The reference number of the engineering item.
 - ERP Project
 - The ERP project for which the item is created.
 - Engineer
 - The code of the employee who is assigned the engineer's role.
 - Life Cycle
 - 
            
The stage at which the parent item is, in the production life cycle. This is used to track the item through the various phases (from design to production).
Allowed values
- In Design
 - Approved to Production
 - Released to Production
 
 - Object Type
 - 
            
The category of the object.
Allowed values
- Item
 - Folder
 - Maintenance Sales Order
 - Maintenance Sales Order Item Lines
 - Bill of Material
 - Contracts
 - Inspection Plans
 - Inspection Plan Characteristics
 - Serial End Item Header
 - Serial End Item Components
 - Opportunity
 - Warehouse Order
 - Business Process
 - Planned Order
 - Purchase Requisition Order
 - Incident Number CAR
 - Incident Number CAR1
 - Incident Number CAR2
 - Incident Number CAR3
 - CUSAI Number
 - Planned Item
 - ERP Work Center
 - Instruments
 - Tool
 - Installation
 - Adjustment Order
 - Adjustment Order Line
 - Warehouse Receipt
 - Match Approve Pur Inv
 - Manufacturer
 - Supplier
 - Contractor
 - Category
 - File
 - Hardcopy
 - Business Process Comment
 - ECM File
 - ECM Document
 - Purchase Order
 - Purchase Order Line
 - Sales Order
 - Sales Order Line
 - Production Order
 - Service Order
 - Routing
 - Routing Line
 - Fixed Asset
 - Sales Quotation
 - Sales Quotation Line
 - Purchase Inquiry
 - Purchase Inquiry Line
 - ECM Project
 - Charge Element
 - Employee
 - Business Partner
 - Customer Business Partner
 - Supplier Business Partner
 - LOT
 - Abstract Items
 - Configuration Items
 - Service Order Activity
 - Project (TP)
 - Project (PCS)
 - E Item
 - P Item
 - Service Installation
 - Installation Component
 - Customize Routing
 - Customize Routing Line
 - ERP Task
 - Generic
 - ERP Machine
 - Customized Item
 - Service Call
 - Service Contract
 - Service Contract Quote
 - Service Order Quote
 - Service Quote Activity
 - Reference Activity
 - ECO
 - Budget
 - Feature
 - Calculation Part
 - Routing Sheet Budget
 - Routing Sheet Operation
 - Sales Activity
 - Purchase Requisition
 - Purchase Req Line
 - SCH Sales Contract
 - SCH Sales Contract Line
 - SCH Purchase Contract
 - SCH Purchase Cont Line
 - Option
 - NCR
 - Abstract File
 - Abstract Document
 - Abstract BP
 - Illustration
 - Material
 - Formula
 - Markup
 - Tessellation
 - Plan Material Purchase Order
 - Project Activity
 - Labor Budget
 - Equipment Budget
 - Subcont Budget
 - Sundry Budget
 - Purchase Advice
 - Purchase Advice Line
 - Material Requisition
 - Work Breakdown Structure
 - System
 - Document
 - System Part
 - Space
 - Received Invoices
 - Received Pur Invoices
 - Received Pur Inv Line
 - Serialized Items
 - Serial Numbers
 - Physical Breakdowns
 - Work Order
 - Work Order Activities
 
 - Activity/Element
 - The default code of the project element / activity linked to the item.
 - Long Lead Item
 - 
            
If this check box is selected, the item is the long lead item.
 - NSN
 - Drawing Reference
 - The drawing reference is an alpha numeric text.
 - Effectivity Indicator
 - 
            
...
Allowed values
- Date
 - Unit
 
 - Volume
 - The volume of the item.
 - Item Character
 - 
            
The category to which the item is related.
Allowed values
- Engineering Item
 - Product
 - Package
 - Label
 - Standard Component
 - WBS
 - 
              
Used for Project integration to define project structure. For WBS of Item character, Budget Element ID is mandatory.
 - WP
 - 
              
Used for Project integration to define project structure. For WP of Item character, Budget Element ID is mandatory.
 - Project Item
 - 
              
Used for Project integration to define the project material or items.
 - Tool
 - Generic
 - Feature
 - Option
 
 - Phantom
 - 
            
If this check box is selected, the item is considered as a phantom item.
 - Recyclability
 - 
            
The level of recycling of the item.
Allowed values
- R1
 - R2
 - R3
 
 - Service
 - 
            
If this check box is selected, the item is a Service item and is included in the BOM for future maintenance and repairs.
 - Locked By
 - The name of the user who has locked the item.
 - Originating Item
 - 
            
Indicates if the item is the basic model in the associated CAD system to which all the other members in the category are related.
 - Logistic Template
 - The default logistic template for the item.
 - Create CAD File
 - 
            
Indicates if CAD file must be created for the item.
Allowed values
- Yes
 - No
 - Yes (Create Assembly)
 
 - State
 - 
            
The physical state of the item.
Allowed values
- Solid
 - Solution
 - Powder
 - Steam
 - Melted
 - Liquid
 
 - Expiry Period
 - The time duration by when the item expires.
 - Expiry Duration Units
 - 
            
The units in which time duration is expressed.
Allowed values
- Minute
 - Hour
 - Day
 - Week
 - Month
 
 - Formula Type
 - 
            
The type of formula.
Allowed values
- General
 - Master
 - Site
 - Control
 
 - Unit
 - The quantity of the item on which the engineering BOM is based. The main purpose of this unit is to include very small quantities of a component in the engineering BOM.
 - Quantity Basis
 - 
            
...
Allowed values
- Batch Percentage
 - Weight Percentage
 - Ratio
 
 - Primary Formula
 - 
            
...
 - Configuration
 - The configuration ID.
 - Quote
 - Quote Revision
 - Certified Date
 - The date on which the item is declared as certified for the first time in PLM.
 - Assessment Date
 - The date on which the item is last assessed.
 - Compliance Comment
 - The information related to item compliance or non-compliance.
 - Exemption Reason
 - The code of the reason if compliance Status is compliant with exemptions.
 - Unit Effective
 - 
            
If this check box is selected, the Unit Effectivity Series and Unit Sequences are defined for the item.
 - Interchangeable
 - 
            
Indicates if the unit of the item is interchangeable. This field is relevant only if unit effectivity is applicable for the item.
 - Series Present
 - 
            
...
 - Product Class
 - The product class code associated with the item.
 - Product Line
 - The product line code associated with the item.
 - Planner
 - The code of the employee performing the planner's role.
 - Product Code
 - The product code associated with the item.
 - Item Group
 - The code of the item group. Sets of items are grouped on the basis of common features.
 - Product Type
 - The code of the product type of the item.
 - Selection Code
 - The selection code of the item.
 - Signal Code
 - The signal code associated with the item.
 - BOM Quantity
 - The quantity of item in the BOM.
 - Unit Set
 - The code of the unit set.
 - Manufacturer
 - The default manufacturer of the selected component item.
 - Weight Unit
 - The unit of weight of the item.
 - Cage Code
 - 
            
The unique Commercial and Government Entity Code, or CAGE Code, assigned to suppliers associated with various government or defense agencies.
Allowed values
- Cage Code 1
 
 - Warehouse
 - The default warehouse in which the item is stored.
 - Mass Gravity Unit
 - Volume Gravity Unit
 - Assessment By
 - The login ID of the person implementing the change.
 - Is Latest
 - 
            
Indicates if the revision of the item is the latest.
 - Use-Up Item
 - 
            The ID of the item that can replace the item specified in the Assembly Part field.
            
A material from the previous bill of material (BOM) revision, which is now a use-up material. As long as inventory is available this item can be used instead of the material item.
Note: This option is enabled only if Use-Up Materials check box is selected in the Users PLM Preferences (pdadm0102m200) session. - Status
 - 
            
The status of an item.
Allowed values
- Draft
 - Released
 - Under Change
 - Obsolete
 
 - Status
 - 
            The status of an item.
            
Allowed values
- Draft
 - Released
 - Under Change
 - Obsolete
 
 - BOM Status
 - 
            
The status of BOM.
Allowed values
- Draft
 - Approved
 
 - Component
 - 
            
 - Use Up
 - 
            
 - Alternatives Present
 - 
            
...
 - Reference Designators Present
 - 
            
...
 - Text
 - 
            
Indicates if text is present for the item.