To perform subcontracting without material flow support
In the subcontracting process without material flow support, the transportation of materials and subassemblies from the manufacturer to the subcontractor and the return of the completed subassemblies to the manufacturer are not registered.without material flow
Outgoing and incoming subassemblies are not maintained.
Consequently, the subcontracting purchase order line has no subassembly, but an administrative item of item type Subcontracted Service, and the subcontracting purchase order has no material lines.
A subcontracted service item is not a physical item. It has no standard costs, cannot be stored in inventory and thus it has no inventory valuation method.
If multiple operations are subcontracted, with more than one subcontractor involved, a purchase order is generated for each subcontractor.
The procedure for operation subcontracting without material flow similar to the procedure for operation subcontracting with material flow.
Detailed instructions about the steps in the following procedure, such as creating and handling a production order, issuing materials, handling operations, and handling purchase orders are provided in To perform operation subcontracting with material flow support.
To perform subcontracting without material flow support, complete these steps: