Job Shop Planning Bills of Material (cprpd3146m000)
insert, update or delete Job Shop Planning Bills of Material.
           Note: This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
          
         Field Information
- Product
 - 
            The code of main item of the job shop planning bill of material.
            Note: The product must be a generic plan item.
 - Production Site
 - 
            The code of source site of the job shop planning bill of material.
            Note: This field is defaulted from the production site of the product.
 - Revision
 - 
            The revision number of the job shop planning bill of material.
            Note: The revision number cannot be modified manually.
 - Status
 - 
            The status of the job shop planning bill of material.Note: The status cannot be modified manually.
Allowed values
- New
 - Approved
 - Expired
 
 - Bill of Material
 - 
            
- BOM Quantity
 - 
              The quantity of the job shop planning bill of material.
              Note:
- The BOM Quantity can be modified only if the status is New.
 - The BOM Quantity is defaulted with 1.0.
 - The BOM quantity needs to be rounded on the inventory unit.
 
 - Effective Date
 - 
              The date and time from when the job shop planning bill of material is effective.
              Note:
- The effective date can be modified only if the status is New.
 - The effective date is defaulted from the current date.
 
 - Expiry Date
 - 
              The date and time up to which the job shop planning bill of material is effective.
              Note:
- The expiry date can be modified only if the status is New.
 - The expiry date is defaulted with the maximum UTC date.
 - The expiry date must not fall before the effective date.
 
 - Created By
 - The employee who creates the job shop planning bill of material.
 - Created On
 - The date and time when job shop planning bill of material is created.
 - Approved By
 - The employee who approves the job shop planning bill of material.
 - Approved On
 - The date and time when the job shop planning bill of material is approved.
 - Expired By
 - The employee by whom the job shop planning bill of material is set to Expired.
 - Expired On
 - The date and time when the job shop planning bill of material is set to Expired.