Print Critical Material Requirements (cprmp2430m000)
Use this session to print a report of the critical material requirements for a specific plan item or a range of plan items.
Field Information
- Scenario
 - 
            
Specify the first of a range of scenarios for which LN must print a report with information about critical material requirements.
 - Scenario
 - 
            
Specify the last of a range of scenarios for which LN must print a report with information about critical material requirements.
 - From Plan Item
 - 
            
Specify the first of a range of plan items for which LN must print the critical material requirements.
 - To Plan Item
 - 
            
Specify the last of a range of plan items for which LN must print the critical material requirements.
 - Period
 - 
            
Specify the first of a range of plan periods for which LN must print a report about critical material requirements.
 - Period
 - 
            
Specify the last of a range of plan periods for which LN must print a report about critical material requirements.
 - From Req. Item
 - 
            
Specify the first of a range of critical plan items that LN must use as a selection criterion to print reports.
 - To Req. Item
 - 
            
Specify the last of a range of critical plan items that LN must use as a selection criterion to print reports.
 - Period Required
 - 
            
Specify the first of a range of plan periods in which the critical material requirements for which LN prints a report, must be required.
 - -
 - 
            
Specify the last of a range of plan periods in which the critical material requirements for which LN prints a report, must be required.
 - Sort By
 - 
            
Select which report is printed.
Allowed values
- Plan Item
 - Component