更正作业车间工艺流程的已计算提前期 (tirou4200m300)

使用此进程以根据工序提前期,为没有计算或设置工艺流程提前期的作业车间工艺流程计算工艺流程。
地点

The site for which the routing lead time is calculated.

The range of products for which the routing lead time is calculated.

工艺流程

The range of routings for which the lead time is calculated.

修订号

The product revision for which the routing lead time is calculated.

状态

The status of the routing for which the lead time is calculated.

允许值

  • The routing was generated but has not yet been approved.
  • 已核准

    The routing is approved and is in use.
  • 已过期

    The routing has expired and can no longer be used.
Include Routings With Lead Time Method
自动

如果选中此复选框, lead times are only calculated with routings with the lead time calculation method 自动.

人工,提前期为零

如果选中此复选框, lead times are only calculated for routings with the lead time calculation method set to 人工 or zero lead time.

Options
模拟

如果选中此复选框, the routing lead times calculation is simulated and no changes are made.

打印报告

如果选中此复选框, a report is printed once the lead time calculation is completed.