更正作业车间工艺流程的已计算提前期 (tirou4200m300)
- 地点
-
The site for which the routing lead time is calculated.
- 自
-
The range of products for which the routing lead time is calculated.
- 工艺流程
-
The range of routings for which the lead time is calculated.
- 修订号
-
The product revision for which the routing lead time is calculated.
- 状态
-
The status of the routing for which the lead time is calculated.
允许值
-
新
The routing was generated but has not yet been approved. -
已核准
The routing is approved and is in use. -
已过期
The routing has expired and can no longer be used.
-
- Include Routings With Lead Time Method
-
- 自动
-
如果选中此复选框, lead times are only calculated with routings with the lead time calculation method 自动.
- 人工,提前期为零
-
如果选中此复选框, lead times are only calculated for routings with the lead time calculation method set to 人工 or zero lead time.
- Options
-
- 模拟
-
如果选中此复选框, the routing lead times calculation is simulated and no changes are made.
- 打印报告
-
如果选中此复选框, a report is printed once the lead time calculation is completed.