活动概览 (tipcs4503m000)
使用此进程以显示活动数据。
如果通过推进方式启动此进程,则只能查找并选择记录。
- 项目
-
A collection of manufacturing and purchasing actions that are performed for a particular customer order. A project is initiated to plan and coordinate the production of the to be manufactured items.
For a standard-to-order production, the project is only used to link the item with the customer order. A project can also include these:
- Customized item data (BOMs and routings)
- Project planning (activity planning)
- 活动
-
The activity in the network planning for a project.
- 搜索关键字
-
为便于搜索而使用的另一种形式的说明。它通常是完整说明的缩写、首字母缩写或便于记忆的替代说明。
- 任务
-
LN shows the number of the task linked to the activity.
- 工作中心
-
LN shows the code of the work center where the activity must be performed.
- 活动管理员
-
A person responsible for planning or carrying out a project activity.
- 活动估计
-
This field shows whether or not the estimated costs are calculated for the selected activity.
- 文本
-
This field shows whether or not a text is present.
- 活动持续时间
-
The duration of an activity is the number of (work)days which are planned for that activity.
- 最早起始日期
-
The earliest date on which the activity can be started. Use the 生成网络计划 (tipcs4210m000) session to determine this date.
- 最晚起始日期
-
The last date on which the activity can be started. Use the 生成网络计划 (tipcs4210m000) session to determine this date.
- 最早终止日期
-
The earliest date on which the activity can be completed. Use the 生成网络计划 (tipcs4210m000) session to determine this date.
- 最晚终止日期
-
The last date on which the activity can be completed. Use the 生成网络计划 (tipcs4210m000) session to determine this date.
- 合计浮动时间
-
The total float of an activity is the maximum time expressed in (working) days in which that activity can be shifted without affecting the planned completion date of the relevant project.
The total float time is calculated:
Total Float = Latest Finish - Earliest Start - Activity Duration
The latest finish date and earliest start date are expressed in project days.
Note:The corresponding Total Slack field in MS Project is expressed in hours.
The conversion is based on the 工作中心 field and the 按资源单位列出的日基本能力 field linked to the specified work center.
- 自由浮动时间
-
The free float time between one activity and the next. The free float time indicates how many days the activity can be extended without jeopardizing the progress of other related activities.
Note:The corresponding Free Slack field in MS Project is expressed in hours.
The conversion is based on the 工作中心 field and the 按资源单位列出的日基本能力 field linked to the specified work center.
- 最早起始星期
-
The earliest week in which the activity can be started.
- 年度
-
The year of the earliest week in which the activity can be started.
- 最迟起始星期
-
The earliest week in which the activity can be completed.
- 年度
-
The year of the earliest week in which the activity can be completed.
- 最早结束星期
-
The last week in which the activity can be started.
- 年度
-
The year of the last week in which the activity can be started.
- 最迟结束星期
-
The last week in which the activity can be completed.
- 年度
-
The year of the last week in which the activity can be completed.
- 要求起始日期
-
The desired start date is the date on which you want to start the relevant activity. This date is only used for information. However, the desired start date is compared to the earliest and latest finish dates and the reference date with the 生成网络信息 (tipcs4211m000) session. This can result in the creation of exception messages.
- 要求的终止日期
-
The desired finish date is the date on which you want to stop the relevant activity. This date is only used for information. However, the desired finish date is compared to the earliest and latest finish date and the reference date with the 生成网络信息 (tipcs4211m000) session. This can result in the creation of exception messages.
- 粗略能力需求
-
The globally required capacity in hours for the execution of the relevant activity.
- 汇总能力需求
-
The aggregated capacity-requirements in hours, depending on the work center where the activity is scheduled to be carried out. The aggregated capacity requirements are calculated in the 汇总项目估计能力 (tipcs4201m000) session on the basis of the project structure and the project engineering. You must first link the operations to activities in the customized routing.
The aggregated capacity-requirements are only shown for your information and can be used for checking or monitoring the rough planned hours by activity.
- 可用能力[小时/天]
-
The available capacity in hours per day for each employee or machine. Based on this capacity, the default duration of an activity is calculated using the appropriate formula.
- 计划因子
-
The planning factor indicates how many employees or machines are employed simultaneously for the execution of an activity. This factor is only used to calculate the default duration of the activity on the basis of the global capacity requirements and the available hours per day.
- 耗用关键能力
-
The actual hours spent on the relevant activity. Based on the transaction hours linked to the activity, LN automatically updates this value in the 处理工时和费用 (bptmm1203m000) session.
LN displays the number of hours spent as calculated by the 生成网络计划 (tipcs4210m000) session.
- 实际起始日期
-
The actual start date for the activity is the date on which its execution was started. The actual start date is filled by LN when transaction hours are processed with the 处理工时和费用 (bptmm1203m000) session or when a network calculation is executed using the 生成网络计划 (tipcs4210m000).
- 实际终止日期
-
The actual finish date for the activity is the date on which time was LAST spent on or on which the execution of the activity was completed. LN fills the actual finish date, when transaction hours are processed with the 处理工时和费用 (bptmm1203m000) session, or when a network calculation is executed with the 生成网络计划 (tipcs4210m000) session. You can change this date manually.
- 完成百分比
-
This field shows whether or not the activity is completed.