装配线利用率 (tiasl3500m000)

使用此进程以显示为装配线计划的订单数,以及该装配线所允许的最大订单数。

相应菜单选项

您可以启动下列进程:

  • 装配线利用率图表 (tiasl3700m000)
  • 重新计算装配线利用率 (tiasl3200m000)
  • 按关键选项组合列出的利用率 (tiasl3510m000)
装配线

A set of consecutive line stations in which FAS (Final Assembly Schedule) items are manufactured. The items are manufactured by passing the items from line station to line station and by carrying out operations at each line station. An assembly line is subdivided into a number of line segments separated by buffers. An assembly line can be either a main line or a supplying line.

日期

利用率数据所参考的计划下线日期

实际订单数

指定日期的装配线计划的订单数。

最大订单数

装配线的最大订单能力。此能力由装配线混合订单规则确定。