Static Condition Values by Project Model (tgbrg5595m000)
Use this session to list the static conditions that you can display and maintain in the Static Condition Values by Project Model (tgbrg5195s000) session.
There are three ways to import or set a static condition:
- Click the Insert icon.
- Start the Set Static Conditions with Rules (Project Model) (tgbrg7210m000) session.
- Start the Set Static Condition Values to Default (tgbrg5295m000) session.
If the Optimization Phase field is empty, the value of the static condition applies to all optimization phases in the project model.
Field Information
- Current Modeling Version
-
current modeling version
- Project Model
-
project model
- Description
-
The description or name of the project model.
- Version
-
version
- Description
-
The description or name of the version.
- Optimization Phase
-
optimization phase
- Description
-
The description or name of the optimization phase.
- Sequence
-
sequence number
- Static Condition
-
static condition
- Description
-
The description or name of the static condition.
- Condition Value
-
The way in which you link the static conditions by using the Condition (tgbrg5145s000) session determines how the value of the current field is applied to a business process.
The value of the current field can be:
- The default value as specified in the Static Conditions (tgbrg5580m000) session.
- The value set by the static-condition-setting rule when the Set Static Conditions with Rules (Project Model) (tgbrg7210m000) session is carried out.
- The value that is set manually in the Static Condition Values by Project Model (tgbrg5195s000) session.
- Set by Rule
-
The static-condition-setting rule that set the value of the static condition.
This field only applies to static conditions whose values are set by means of the Set Static Conditions with Rules (Project Model) (tgbrg7210m000) session.