Freeze and confirm combined or separate activities
Combined Freeze/Confirm Shipments/Loads activity
If freezing and confirming is a combined activity, shipments are automatically confirmed, without freezing, if you set this activity to automatic.
If not set to automatic performance, the Freeze/Confirm Shipments/Loads (whinh4275m000) session is started. In this session, you can confirm, or first freeze and then confirm shipments and loads.
If the shipment documents must be printed automatically, printing is started as soon as the status of the shipment or load changes from Open to Frozen or Confirmed, if the Freeze/Confirm Shipments/Loads (whinh4275m000) activity is set to automatic performance.
Split Freeze/Confirm Shipments/Loads into Freeze and Confirm activities
If required, you can convert the combined Freeze/Confirm Shipments/Loads (whinh4275m000) activity to these freeze and confirm activities:
- Freeze
- Confirm
Both activities are performed using the Freeze/Confirm Shipments/Loads (whinh4275m000) session.
To convert the freeze/confirm activity, select Split Freeze/Confirm Shipments/Loads Activity on the appropriate menu of these sessions:
- Warehousing Order Types (whinh0110m000)
- Shipment Activities by Procedure (whinh0106m400)
- Warehousing Order Type (whinh0610m000)
In this session, the conversion option is available in the header section and in the lines section of the Shipment Activities tab.