tsacm domains

Field Service

The reference activity can be used only for Field Service usage.

Depot Repair

The reference activity can be used only for Depot Repair usage.

General

The reference activity is not restricted to any particular usage and can be used generally. This activity can be used for Field Service and/or depot repair.

Rental

The reference activity can be used only for Rental usage.

Activity Duration

The manual entry is considered to determine duration of the master routing operation.

Operation Lead Times

Total of the operation lead times (Labour Runtime, Machine Runtime and Setup Time) is considered to determine duration of the master routing operation.

Labor

The labor required to execute a reference activity. The required labor time can be only be specified when the reference activity is used for field service.

Tool

The tool required to execute the reference activity. This tool is returned after the Reference Activity is completed.

Subcontracting

The subcontracting requirement. In case the reference activity is specified for subcontracting, and it is used for field service then the subcontracting requirement must be specified.

Other

The resource that is needed and which cannot be scaled, is termed as Other Resource Types.

Material

Materials that are needed to execute the reference activity.