- Start Date of Serialized Item
-
The application considers the priorities defined in the planning parameters to determine the start date for the maintenance cycle.
- Time from in Selection Range
-
The application considers the From Date to start the maintenance cycle for the serialized item.
- 1st of January
-
The application considers the 1st January of the year specified in the From Date to start the maintenance cycle for the serialized item.
- Planned Activity
-
The item fields are not available.
- Installation Group
-
The activity and item fields are not available.
- Serialized Item
-
The activity fields are not available.
Note: The layout of the printout remains the same at all times.
- Reference Point
- Resource
- Not Applicable
- Created
-
The activity is imported from service order activity, work order activity or planned activity. The activity is yet to be planned.
- Planned
-
The activity is successfully planned (planning times are updated). The updated start and finish times can be copied to the service order activity, work order activity or planned activity.
- Not Planned
-
The activity could not be planned. Owing to failure of the planning process, the activity must be re-planned.
- Released
-
The updated start and finish times of the activity are copied to the service order activity, work order activity or planned activity.
- Crow Based
-
The distance is calculated "as the crow flies" and from this distance the travel time is calculated with the information of the average travel speed towards the location of serialized item.
- Road Based Distance Only
-
The distance is calculated with the type of website you select in the provider field in the Service Planning Parameters (tsspc0100m000) session.
- Road Based Distance and Travel Time
-
The distance and the travel time are calculated with the type of website you select in the provider field in the Service Planning Parameters (tsspc0100m000) session
- Crow Based, Travel Time Crow Based
-
If this check box is selected, LN calculates allocation based on as the crow flies. At the end of the allocation the distances and travel times are also calculated from the center of gravity (and/or location of engineer) as the crow flies.
- Crow Based, Travel Time Road Based
-
If this check box is selected, LN calculates allocation based on as the crow flies. At the end of the allocation the distances and travel times are calculated again with the use of a web service that is selected in the Service Planning Parameters (tsspc0100m000) session.
- Road Based, Travel Time Road Based
-
If this check box is selected, LN calculates allocation based on the Road. This means that during the allocation also the web service is used for the travel time calculation, as well as at the end of the allocation. This option is only possible if all the available capacities are using a fixed reference point.
- From Employee Calendar
- Manually
- Service Order
- Work Order
- Planned Activity
- Project
- Non-Conformance Report
- Corrective Action Plan
- Job Shop Order
- Project (PCS)
- Reference Activity
- Serialized Item
- Installation Group
- Item - Service
- Not Applicable
- Delete Forward
-
The planned activities with the Planned Start Time after the Delete Plan Up To date are deleted.
- Delete Backward
-
The planned activities with the Planned Start Time before the Delete Plan Up To date are deleted.
- Key
- Search Key
- Description
- Not Applicable
- Installation Date Serialized Item
- Delivery Date Serialized Item
- Status Start Date Installation Group
- Creation Date Serialized Item
- Not Applicable
- Keep the existing Plan
-
The planned activities that are already created for the selected serialized items are not deleted and the application generates the maintenance plans after the finish date of the last planned activity. This date is specified as the Planned Until Time in the Serialized Items (tscfg2100m000) session.
- Regenerate the existing Plan
-
The application first deletes the open planned activities created for the selected serialized items from the From Date specified in the Generate Maintenance Plan (tsspc2200m000) session and generates the maintenance plans once again.
- Non-Conformance Report
- Sold-to BP
- Ship-to BP
- Service Department
- Project Management Office
- Department
- Production Department
- Allocated Engineers
- Preferred Engineer
- Preferred Employee
- Assigned Employee
- Actual Employee
- Activity Manager
- Service Contract
- Contract
- Service Order
- Service Type
- Work Order
- Reference Activity
- Activity
- Standard Activity
- Task
- Task Type
- Planned Activity
- Coverage Type
- Trade Group
- Activity Usage
- Order Procedure
- Project
- Corrective Action Plan
- Master Routing
- Address
- Reference Point
- Routing Option
- Service Car
- Routing
- Appointment
- Element
- Serialized Item
- Top Serialized Item
- Planned Start Time
- Planned Finish Time
- Earliest Start Time
- Latest Finish Time
- Skill
- Job Shop Order
- Service Area
- From Warehouse
- To Warehouse
- Warehouse
- From Location
- To Location
- Location
- From Workcenter
- To Workcenter
- Work Center
- Machine
- Installation Group
- Item
- Service Item Group
- Activity Group
- Buy-from BP
- Parallel
-
The order activities are grouped into separate groups.
- Sequential
-
The order activities are grouped into separate activity sets within the same group.
- Group
-
This option deletes a group or more than one group. The groups and activities of the selected groups are deleted.
- Activity set
-
This option deletes the activity sets of the selected group.
- Activity
-
This option deletes the activities of the selected group.
- Planned Available Date
- Required Delivery Date
- ATP Date
- Not Applicable
- Month
- Week
- Not Applicable
- Manual
- Call
- Maintenance Plan
- No
-
Activities are sorted based on time, the activities will not be planned.
- From Start Time Activities
-
The start time of the first activity in a group to be planned is the earliest start time of the activity. If no earliest start time is specified for the activity, the planned start time (a mandatory field) will be used.
- From Specified Time
-
The start time of the first activity to be planned is defined by the user in field Plan Forward From. The time in this field is the start time of the first activity in a group to be planned. When no start time is specified LN displays an error message.
- From Finish Time Orders
-
The start time of the first planned activity to be planned is the finish time of the last service order with the same characteristics as the planned activity. This option is only applicable for planned activities.
- Planning Based on Time
- Planning Based on Route
- Time Based
-
For a time based maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.
- Usage Based
-
For a usage based maintenance scenario, the maintenance plan is generated if the scenario line is setup for a specific child item that matches with the item of the serialized item.
- Time Based Pattern
-
For a time based pattern maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.
- Not Allocated to Other Planning Groups
- Has all Planning Group Attribute Values
- Has all Mandatory Skills
- Has all Preferred Skills
- Is First Available
- Prediction
-
The predicted activities will be printed.
- Ref. Activities by Item
-
The reference activities per item will be printed.
- Time Based - Maintenance Scenarios
- Usage Based - Serialized Items
- Time Based - Rule Book
- Time Based - Item Service Data
- Time Based - Items
- Time Based - Serialized Items
- Usage Based - Maintenance Scenarios
- Usage Based - Rule Book
- Usage Based - Item Service Data
- Usage Based - Trigger Sets
- Usage Based - Trigger Set Rule Book
- Usage Based - Items
- Employee
-
Define employee code and the employee name.
- Simulation
-
LN counts the existing simulation resources and enters a value adding 1 that is more than the existing number.
- Not Applicable
- At First Activity
- At Company Address
- At Department Address
- At Employee Home Address
- 2
- 3
- 4
- 5
- 1
- All Serialized Items
- Selection of Serialized Items
- Selection of Top Items
- All Planned Activities
- Selection of Planned Activities
- All Maintenance Scenarios
- Selection of Scenarios
- Usage Based Only
- Time Based Only
- Time Based and Usage Based
- Specific
-
Attribute Values are checked, and all the values specifically match.
- Non Specific
-
When for an Attribute the Any Value is Yes.
- No
-
When the resource is proposed based on skills.
- Earliest Start
- Latest Finish
- Latest Start
- Planned Start
- Planned Finish
- Released
- Transferred
- Canceled
- Free
- Planned Start Time
- Planned Finish Time
- Earliest Start Time
- Latest Finish Time
- Planned Times
- Original Times
- Actual Times
- Part of Day
- Day
- Week
- Month
- Quarter
- Absolute
- Relative
- Not Applicable
- Scheduling
-
This leveling method uses the finish time of the groups in a group to divide the activities over two or more groups.
- Geographically
-
This leveling method uses the total activity duration and travel time in a region to divide the activities over two or more groups.