tsspc domains

Start Date of Serialized Item

The application considers the priorities defined in the planning parameters to determine the start date for the maintenance cycle.

Time from in Selection Range

The application considers the From Date to start the maintenance cycle for the serialized item.

1st of January

The application considers the 1st January of the year specified in the From Date to start the maintenance cycle for the serialized item.

Planned Activity

The item fields are not available.

Installation Group

The activity and item fields are not available.

Serialized Item

The activity fields are not available.

Note: The layout of the printout remains the same at all times.
Reference Point
Resource
Not Applicable
Created

The activity is imported from service order activity, work order activity or planned activity. The activity is yet to be planned.

Planned

The activity is successfully planned (planning times are updated). The updated start and finish times can be copied to the service order activity, work order activity or planned activity.

Not Planned

The activity could not be planned. Owing to failure of the planning process, the activity must be re-planned.

Released

The updated start and finish times of the activity are copied to the service order activity, work order activity or planned activity.

Crow Based

The distance is calculated "as the crow flies" and from this distance the travel time is calculated with the information of the average travel speed towards the location of serialized item.

Road Based Distance Only

The distance is calculated with the type of website you select in the provider field in the Service Planning Parameters (tsspc0100m000) session.

Road Based Distance and Travel Time

The distance and the travel time are calculated with the type of website you select in the provider field in the Service Planning Parameters (tsspc0100m000) session

Crow Based, Travel Time Crow Based

If this check box is selected, LN calculates allocation based on as the crow flies. At the end of the allocation the distances and travel times are also calculated from the center of gravity (and/or location of engineer) as the crow flies.

Crow Based, Travel Time Road Based

If this check box is selected, LN calculates allocation based on as the crow flies. At the end of the allocation the distances and travel times are calculated again with the use of a web service that is selected in the Service Planning Parameters (tsspc0100m000) session.

Road Based, Travel Time Road Based

If this check box is selected, LN calculates allocation based on the Road. This means that during the allocation also the web service is used for the travel time calculation, as well as at the end of the allocation. This option is only possible if all the available capacities are using a fixed reference point.

From Employee Calendar
Manually
Service Order
Work Order
Planned Activity
Project
Non-Conformance Report
Corrective Action Plan
Job Shop Order
Project (PCS)
Reference Activity
Serialized Item
Installation Group
Item - Service
Not Applicable
Delete Forward

The planned activities with the Planned Start Time after the Delete Plan Up To date are deleted.

Delete Backward

The planned activities with the Planned Start Time before the Delete Plan Up To date are deleted.

Key
Search Key
Description
Not Applicable
Installation Date Serialized Item
Delivery Date Serialized Item
Status Start Date Installation Group
Creation Date Serialized Item
Not Applicable
Keep the existing Plan

The planned activities that are already created for the selected serialized items are not deleted and the application generates the maintenance plans after the finish date of the last planned activity. This date is specified as the Planned Until Time in the Serialized Items (tscfg2100m000) session.

Regenerate the existing Plan

The application first deletes the open planned activities created for the selected serialized items from the From Date specified in the Generate Maintenance Plan (tsspc2200m000) session and generates the maintenance plans once again.

Non-Conformance Report
Sold-to BP
Ship-to BP
Service Department
Project Management Office
Department
Production Department
Allocated Engineers
Preferred Engineer
Preferred Employee
Assigned Employee
Actual Employee
Activity Manager
Service Contract
Contract
Service Order
Service Type
Work Order
Reference Activity
Activity
Standard Activity
Task
Task Type
Planned Activity
Coverage Type
Trade Group
Activity Usage
Order Procedure
Project
Corrective Action Plan
Master Routing
Address
Reference Point
Routing Option
Service Car
Routing
Appointment
Element
Serialized Item
Top Serialized Item
Planned Start Time
Planned Finish Time
Earliest Start Time
Latest Finish Time
Skill
Job Shop Order
Service Area
From Warehouse
To Warehouse
Warehouse
From Location
To Location
Location
From Workcenter
To Workcenter
Work Center
Machine
Installation Group
Item
Service Item Group
Activity Group
Buy-from BP
Parallel

The order activities are grouped into separate groups.

Sequential

The order activities are grouped into separate activity sets within the same group.

Group

This option deletes a group or more than one group. The groups and activities of the selected groups are deleted.

Activity set

This option deletes the activity sets of the selected group.

Activity

This option deletes the activities of the selected group.

Planned Available Date
Required Delivery Date
ATP Date
Not Applicable
Month
Week
Not Applicable
Manual
Call
Maintenance Plan
No

Activities are sorted based on time, the activities will not be planned.

From Start Time Activities

The start time of the first activity in a group to be planned is the earliest start time of the activity. If no earliest start time is specified for the activity, the planned start time (a mandatory field) will be used.

From Specified Time

The start time of the first activity to be planned is defined by the user in field Plan Forward From. The time in this field is the start time of the first activity in a group to be planned. When no start time is specified LN displays an error message.

From Finish Time Orders

The start time of the first planned activity to be planned is the finish time of the last service order with the same characteristics as the planned activity. This option is only applicable for planned activities.

Planning Based on Time
Planning Based on Route
Time Based

For a time based maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.

Usage Based

For a usage based maintenance scenario, the maintenance plan is generated if the scenario line is setup for a specific child item that matches with the item of the serialized item.

Time Based Pattern

For a time based pattern maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.

Not Allocated to Other Planning Groups
Has all Planning Group Attribute Values
Has all Mandatory Skills
Has all Preferred Skills
Is First Available
Prediction

The predicted activities will be printed.

Ref. Activities by Item

The reference activities per item will be printed.

Time Based - Maintenance Scenarios
Usage Based - Serialized Items
Time Based - Rule Book
Time Based - Item Service Data
Time Based - Items
Time Based - Serialized Items
Usage Based - Maintenance Scenarios
Usage Based - Rule Book
Usage Based - Item Service Data
Usage Based - Trigger Sets
Usage Based - Trigger Set Rule Book
Usage Based - Items
Employee

Define employee code and the employee name.

Simulation

LN counts the existing simulation resources and enters a value adding 1 that is more than the existing number.

Not Applicable
At First Activity
At Company Address
At Department Address
At Employee Home Address
2
3
4
5
1
All Serialized Items
Selection of Serialized Items
Selection of Top Items
All Planned Activities
Selection of Planned Activities
All Maintenance Scenarios
Selection of Scenarios
Usage Based Only
Time Based Only
Time Based and Usage Based
Specific

Attribute Values are checked, and all the values specifically match.

Non Specific

When for an Attribute the Any Value is Yes.

No

When the resource is proposed based on skills.

Earliest Start
Latest Finish
Latest Start
Planned Start
Planned Finish
Released
Transferred
Canceled
Free
Planned Start Time
Planned Finish Time
Earliest Start Time
Latest Finish Time
Planned Times
Original Times
Actual Times
Part of Day
Day
Week
Month
Quarter
Absolute
Relative
Not Applicable
Scheduling

This leveling method uses the finish time of the groups in a group to divide the activities over two or more groups.

Geographically

This leveling method uses the total activity duration and travel time in a region to divide the activities over two or more groups.