Generate Batch Repair Work Orders (tswcs2200m000)

Use this session to generate the work order for the selected range of serialized items from multiple warehouses.

Note: 

A batch repair order is generated only if :

  • the item is serialized controlled in Service
  • the item is serialized controlled in the Items (tcibd0501m000) session
  • the item is serialized controlled in the Serialized Items (tscfg2100m000) session

Field Information

From Item

The From and To fields define a range of: item.

To Item

The From and To fields define a range of: item.

From Serial Number

The From and To fields define a range of: serial number.

To Serial Number

The From and To fields define a range of: serial number.

Site

The From and To fields define a range of: sites

From Warehouse

The From and To fields define a range of: warehouse.

To Warehouse

The From and To fields define a range of: warehouse

Status Time

The From and To fields define a range of: date and time.

Status Time

The From and To fields define a range of: date and time.

Lot

The From and To fields define a range of: lot.

Lot

The From and To fields define a range of: lot.

Revision

The From and To fields define a range of: revision controlled item.

Revision

The From and To fields define a range of: revision controlled item.

Work Order Series

The series code that identifies the work order.

Department

The code of the department .

Department

The description or name of the code. department.

Warehouse Incoming

All the serialized items that must be repaired are transferred to this warehouse before they are issued to the Service Department.

Warehouse Incoming

The description or name of the code. warehouse.

Warehouse Outgoing

All the items after repair with the serial status Defective, Working Condition, To be Recycled are received in this warehouse from the Service Department after the work order is closed

Warehouse Outgoing

The description or name of the code. warehouse.

Master Routing

The code of the master routing.

Note: When the Master Routing or Reference activity field has a value a Work Order activity is created
Reference Activity

The code of the reference activity.

Note: When the Master Routing or Reference Activity field has a value, a work order activity is created.
Process Report

If this check box is selected, LN prints a process report.

Error Report

If this check box is selected, LN prints an error report.