Territory and Preferred Engineer Planning (tsspc4600m000)
Use this session to specify the data for territory and preferred engineer planning.
Field Information
- General
-
- Territory Planning
-
The unique ID of territory planning.
- Description
-
The description or name of the code.
- Text
-
If this check box is selected, a text is present.
- Number of Visits
-
The number of visits of the service engineer in a day.
- Unit
-
The unit in which the number of visits is expressed.
- Capacity Allocations Calculated On
-
The date and time when the capacity allocations is calculated.
- Required Capacity
-
- Number of Serialized Items
-
The number of the serialized item to be used for territory planning.
- Unassigned
-
The number of serialized item that is not assigned to available capacity.
Note: If calculation run is not executed, the value in this field is the same as the number of serialized items. - Planned Activities
-
The total time of the planned activities.
- Unit
-
The unit in which the total time is expressed.
- Visits
-
The total number of planned activity visits by the service engineer.
- Service Orders
-
The total amount of time required to execute the service orders.
- Visits
-
The total number of visits by the service engineer for the service orders.
- Unexpected Workload
-
The total time of the unexpected workload for the service engineer.
- Visits
-
The number of unexpected visits by the service engineer.
- Expected Travel Time
-
The total time of the expected travel of the service engineer calculated by LN.
- Total Capacity
-
The total capacity of the available resources.
- Visits
-
The number of visits by the service engineer.
- Available Capacity
-
- Number of Resources
-
The total number available resources.
- Employee Calendar Range
-
This field is displayed only if determine capacity field is set to employee calendar.
-
This field is displayed only if determine capacity field is set from employee calendar.
- Available Capacity
-
The total available capacity of all the resources.
- Workload
-
The total workload of the required capacities that can be assigned to available capacity.
- Travel Time
-
The total travel time of the resources calculated by LN.
- Free Capacity
-
LN calculates the free capacity as follows:
Free Capacity = Available capacity - Assigned Work Load - Calculated travel Time.
- Information
-
The additional information related to the specific territory planning.